ROBINSON ROAD

Substation-Adjacent

Hinds, Mississippi · MISO

DC Readiness
70.1
Excellent / 100

ROBINSON ROAD is a substation-adjacent datacenter candidate site in Hinds, Mississippi, interconnecting through MISO. It screens at 70.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationROBINSON ROAD
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance118.2 mi
Fiber providers6
Fiber coverage49.3%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance382.3 mi

Site characteristics

Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteAXELS
Hazard sub-score45/100
Construction cost index80.6 (avg 100)

Location context

Nearest datacenterAmazon Canton Data Center
DC distance23.8 mi
Nearest rail3.0 mi
Nearest gas pipeline3.4 mi
Nearest fiber route1.4 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.56¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,474

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
54
Fiber connectivity12%
62
Energy cost10%
94
Water risk8%
88
Natural hazard8%
45
Buildability7%
92
Labor market4%
50
DC cluster4%
60
Land / acreage3%
58
Construction cost3%
83
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Hinds, ranked by DC Readiness.

Sites near ROBINSON ROAD
SiteTypeVoltageCapacityQueue waitScore
LAKEOVERSubstation-Adjacent500 kV1,000 MW1.4 yrs74.7
LAKEOVERSubstation-Adjacent500 kV1,000 MW1.4 yrs74.4
RAY BRASWELLSubstation-Adjacent500 kV1,000 MW1.4 yrs73.9
TINNIN ROADSubstation-Adjacent230 kV300 MW1.4 yrs70.6
UNKNOWN110121Substation-Adjacent230 kV300 MW1.4 yrs70.5
NORTHSIDE DRIVESubstation-Adjacent230 kV300 MW1.4 yrs70.4
SOUTHWEST JACKSONSubstation-Adjacent230 kV300 MW1.4 yrs69.5
TINNIN ROADSubstation-Adjacent230 kV300 MW1.4 yrs67.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen