Datacenter Sites in JONES, Mississippi
JONES has 77 scored datacenter candidate sites averaging 49.0/100 DC Readiness, with a catalogued aggregate of 3,100 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
77
Candidate sites
49.0/100
Avg DC Readiness
3,100 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for JONES
Yessales_tax_exemption
Datacenter tax incentive
11.98¢/kWh
Commercial electricity
8.52¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$4,661
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in JONES
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN109551 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 67.6 |
| UNKNOWN169458 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 65.5 |
| UNKNOWN109611 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 65.4 |
| UNKNOWN109754 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.1 |
| TAP169455 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 63.6 |
| UNKNOWN109758 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 63.3 |
| MOSELLE | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 63.1 |
| OZ Jones | Greenfield | — | — | 1.4 yrs | 59.0 |
| Greenfield (UNKNOWN109611 - HATTIESBURG SO) | Greenfield | 230 kV | 300 MW | 1.4 yrs | 59.0 |
| Greenfield (MOSELLE - UNKNOWN110245) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 58.9 |
| Greenfield (UNKNOWN109611 - TAP169513) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 58.6 |
| Greenfield (UNKNOWN109754 - TAP169455) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 57.8 |
| Greenfield (UNKNOWN109611 - HATTIESBURG SO) | Greenfield | 230 kV | 300 MW | 1.4 yrs | 57.7 |
| Greenfield (TAP143409 - UNKNOWN169460) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 57.7 |
| Greenfield (UNKNOWN109551 - UNKNOWN109611) | Greenfield | 230 kV | 300 MW | 1.4 yrs | 57.5 |
| Greenfield (UNKNOWN109611 - HATTIESBURG SO) | Greenfield | 230 kV | 300 MW | 1.4 yrs | 57.0 |
| Greenfield (MOSELLE - UNKNOWN110245) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 55.9 |
| Greenfield (UNKNOWN109611 - TAP169513) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 55.8 |
| Greenfield (TAP143409 - UNKNOWN169460) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 55.0 |
| Greenfield (MOSELLE - UNKNOWN110245) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 52.2 |
| O'REILLY AUTO PARTS (MACHINE SHOPS) | Manufacturing | — | — | — | 46.2 |
| ALLIED UNIVERSAL CORP. (ALKALIES AND CHLORINE MANUFACTURING) | Manufacturing | — | — | — | 46.2 |
| BYRD, INC., DANNY (NOT AVAILABLE) | Manufacturing | — | — | — | 46.2 |
| LAUREL MACHINE & FOUNDRY CO. (MACHINE SHOPS) | Manufacturing | — | — | — | 46.2 |
| ESSMUELLER CO., THE (CONVEYOR AND CONVEYING EQUIPMENT MANUFACTURING) | Manufacturing | — | — | — | 46.2 |
JONES datacenter FAQ
- How many datacenter sites are in JONES?
- 77 scored datacenter candidate sites, averaging 49.0/100 DC Readiness.
- Does JONES offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in JONES?
- FEMA's National Risk Index rates JONES as "Relatively High" (score 45).
- What are industrial electricity rates in JONES?
- Average industrial electricity is 8.52¢/kWh and commercial is 11.98¢/kWh in JONES.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for JONES, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.