Datacenter Sites in LAWRENCE, Mississippi

LAWRENCE has 18 scored datacenter candidate sites averaging 52.1/100 DC Readiness, with a catalogued aggregate of 900 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

18
Candidate sites
52.1/100
Avg DC Readiness
900 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for LAWRENCE

Yessales_tax_exemption
Datacenter tax incentive
13.17¢/kWh
Commercial electricity
9.05¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$3,498
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in LAWRENCE

Top datacenter sites in LAWRENCE
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109885Substation-Adjacent115 kV100 MW1.4 yrs62.9
UNKNOWN110162Substation-Adjacent115 kV100 MW1.4 yrs60.4
UNKNOWN110163Substation-Adjacent115 kV100 MW1.4 yrs59.6
TAP142760Substation-Adjacent115 kV100 MW1.4 yrs57.9
Greenfield (UNKNOWN109885 - TAP143090)Greenfield115 kV100 MW1.4 yrs57.0
Greenfield (UNKNOWN109885 - TAP143090)Greenfield115 kV100 MW1.4 yrs56.9
Greenfield (UNKNOWN109885 - UNKNOWN109978)Greenfield115 kV100 MW1.4 yrs56.6
Greenfield (UNKNOWN109696 - UNKNOWN109885)Greenfield115 kV100 MW1.4 yrs56.5
EC FFE Lawrence CountyGreenfield1.4 yrs55.0
Greenfield (UNKNOWN109885 - TAP143090)Greenfield115 kV100 MW1.4 yrs53.9
LEE'S PIGSKIN CO., INC. (OTHER SNACK FOOD MANUFACTURING)Manufacturing47.1
MILES & SONS, INC., JOE N. (SAWMILLS)Manufacturing46.3
GEORGIA-PACIFIC LLC (ALL OTHER CONVERTED PAPER PRODUCT MANUFACTURING)Manufacturing46.3
MONTICELLO HARDWOOD, INC. (WOOD PRESERVATION)Manufacturing46.3
ATLAS MFG. CO., INC. (NOT AVAILABLE)Manufacturing46.3
Mine SiteFormer Mine43.2
Mine SiteFormer Mine42.9
Mine SiteFormer Mine42.8

LAWRENCE datacenter FAQ

How many datacenter sites are in LAWRENCE?
18 scored datacenter candidate sites, averaging 52.1/100 DC Readiness.
Does LAWRENCE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in LAWRENCE?
FEMA's National Risk Index rates LAWRENCE as "Relatively High" (score 45).
What are industrial electricity rates in LAWRENCE?
Average industrial electricity is 9.05¢/kWh and commercial is 13.17¢/kWh in LAWRENCE.