Lowndes County, Mississippi · MISO

DC Readiness
66.6
Good / 100

TAP144763 is a substation-adjacent datacenter candidate site in Lowndes County, Mississippi, interconnecting through MISO. It screens at 66.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP144763
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth13
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance20.9 mi
Fiber providers5
Fiber coverage87.3%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance483.6 mi

Site characteristics

Parcel ownerUsa Corps Of Eng
Parcel APN29W000000700
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score40/100
Construction cost index87.1 (avg 100)

Location context

Nearest datacenterC Spire Mississippi
DC distance20.9 mi
Nearest rail4.8 mi
Nearest gas pipeline4.4 mi
Nearest fiber route147.0 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.94¢/kWh
Industrial electricity5.75¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,174

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
59
Fiber connectivity12%
79
Energy cost10%
85
Water risk8%
90
Natural hazard8%
40
Buildability7%
75
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
77
Gas pipeline2%
86
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Lowndes County, ranked by DC Readiness.

Sites near TAP144763
SiteTypeVoltageCapacityQueue waitScore
LOWNDESSubstation-Adjacent500 kV1,000 MW1.4 yrs73.5
UNKNOWN109565Substation-Adjacent161 kV100 MW1.4 yrs71.1
UNKNOWN109567Substation-Adjacent161 kV100 MW1.4 yrs70.0
UNKNOWN109566Substation-Adjacent161 kV100 MW1.4 yrs70.0
WEYERHAEUSER COSubstation-Adjacent161 kV100 MW1.4 yrs69.8
UNKNOWN109563Substation-Adjacent161 kV100 MW1.4 yrs68.7
UNKNOWN109599Substation-Adjacent161 kV100 MW1.4 yrs68.2
TAP144760Substation-Adjacent161 kV100 MW1.4 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP144763, Lowndes County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.