PANOLA, Mississippi · MISO

DC Readiness
64.4
Good / 100

N. SARDIS is a substation-adjacent datacenter candidate site in PANOLA, Mississippi, interconnecting through MISO. It screens at 64.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationN. SARDIS
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance40.9 mi
Fiber providers3
Fiber coverage77.5%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance413.6 mi

Site characteristics

Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index68.8 (avg 100)

Location context

Nearest datacenterxAI Macrohardrr
DC distance39.3 mi
Nearest rail1.6 mi
Nearest gas pipeline2.3 mi
Nearest fiber route114.2 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.60¢/kWh
Industrial electricity7.22¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,142

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
48
Fiber connectivity12%
70
Energy cost10%
89
Water risk8%
91
Natural hazard8%
55
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
93
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in PANOLA, ranked by DC Readiness.

Sites near N. SARDIS
SiteTypeVoltageCapacityQueue waitScore
BATESVILLE GENERATION FACILITYSubstation-Adjacent230 kV300 MW1.4 yrs71.5
Batesville Generation FacilityBrownfield292 MW70.6
BATEVILLESubstation-Adjacent230 kV300 MW1.4 yrs66.8
UNKNOWN169491Substation-Adjacent161 kV100 MW1.4 yrs63.9
Greenfield (UNKNOWN111260 - BATEVILLE)Greenfield230 kV300 MW1.4 yrs63.2
TAP149958Substation-Adjacent161 kV100 MW1.4 yrs63.2
UNKNOWN110930Substation-Adjacent115 kV100 MW1.4 yrs62.9
EC Near Batesville Generation FacilityGreenfield1.4 yrs60.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for N. SARDIS, PANOLA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.