Datacenter Sites in PEARL RIVER, Mississippi

PEARL RIVER has 49 scored datacenter candidate sites averaging 53.5/100 DC Readiness, with a catalogued aggregate of 5,700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

49
Candidate sites
53.5/100
Avg DC Readiness
5,700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for PEARL RIVER

Yessales_tax_exemption
Datacenter tax incentive
11.79¢/kWh
Commercial electricity
7.44¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$3,891
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in PEARL RIVER

Top datacenter sites in PEARL RIVER
SiteTypeVoltageCapacityQueue waitScore
Greenfield (MC KNIGHT - DANIEL STATION)Greenfield500 kV1,000 MW1.4 yrs68.7
Greenfield (MC KNIGHT - DANIEL STATION)Greenfield500 kV1,000 MW1.4 yrs67.5
UNKNOWN112446Substation-Adjacent230 kV300 MW1.4 yrs67.3
Greenfield (MC KNIGHT - DANIEL STATION)Greenfield500 kV1,000 MW1.4 yrs66.8
Greenfield (MC KNIGHT - DANIEL STATION)Greenfield500 kV1,000 MW1.4 yrs66.2
UNKNOWN109993Substation-Adjacent115 kV100 MW1.4 yrs66.2
UNKNOWN109997Substation-Adjacent115 kV100 MW1.4 yrs64.7
UNKNOWN109996Substation-Adjacent115 kV100 MW1.4 yrs64.6
TAP143428Substation-Adjacent115 kV100 MW1.4 yrs63.9
UNKNOWN109999Substation-Adjacent115 kV100 MW1.4 yrs63.8
UNKNOWN110236Substation-Adjacent115 kV100 MW1.4 yrs63.7
Greenfield (UNKNOWN112446 - UNKNOWN112451)Greenfield230 kV300 MW1.4 yrs62.9
TAP143368Substation-Adjacent115 kV100 MW1.4 yrs62.6
UNKNOWN109992Substation-Adjacent115 kV100 MW1.4 yrs58.6
Greenfield (UNKNOWN109927 - UNKNOWN110237)Greenfield115 kV100 MW1.4 yrs57.4
Greenfield (UNKNOWN109992 - UNKNOWN109993)Greenfield115 kV100 MW1.4 yrs56.8
STOCKSTILL, INC., HUEY (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing52.3
HSI READY MIX, INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing52.3
RHEOGISTICS, LLC (PLASTICS MATERIAL AND RESIN MANUFACTURING)Manufacturing52.2
ST. TAMMANY BOX CO. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing52.1
WAY, INC., THE (POLISH AND OTHER SANITATION GOOD MANUFACTURING)Manufacturing51.3
TWI CHEMICAL DISTRIBUTORS (ALL OTHER MISCELLANEOUS CHEMICAL PRODUCT AND PREPARATION MANUFACTURING)Manufacturing51.3
AVON ENGINEER FABRICATION, INC. (METAL TANK (HEAVY GAUGE) MANUFACTURING)Manufacturing51.3
HERITAGE PLASTICS, INC. (CUSTOM COMPOUNDING OF PURCHASED RESINS)Manufacturing51.2
VALSPAR REFINISH, INC. (PAINT AND COATING MANUFACTURING)Manufacturing51.1

PEARL RIVER datacenter FAQ

How many datacenter sites are in PEARL RIVER?
49 scored datacenter candidate sites, averaging 53.5/100 DC Readiness.
Does PEARL RIVER offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in PEARL RIVER?
FEMA's National Risk Index rates PEARL RIVER as "Relatively High" (score 45).
What are industrial electricity rates in PEARL RIVER?
Average industrial electricity is 7.44¢/kWh and commercial is 11.79¢/kWh in PEARL RIVER.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PEARL RIVER, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.