Greenfield (GERALD ANDRUS STATION - TINNIN)

Greenfield

SHARKEY, Mississippi · MISO

DC Readiness
57.5
Good / 100

Greenfield (GERALD ANDRUS STATION - TINNIN) is a greenfield datacenter candidate site in SHARKEY, Mississippi, interconnecting through MISO. It screens at 57.5/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationGERALD ANDRUS STATION
Substation voltage230 kV
Available capacity300 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.15¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance116.9 mi
Fiber providers3
Fiber coverage40.1%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance351.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score40/100
Construction cost index27.2 (avg 100)

Location context

Nearest datacenterAmazon Canton Data Center
DC distance49.3 mi
Nearest rail23.9 mi
Nearest gas pipeline2.0 mi
Nearest fiber route18.2 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity15.28¢/kWh
Industrial electricity7.50¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,746

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
48
Fiber connectivity12%
44
Energy cost10%
95
Water risk8%
89
Natural hazard8%
40
Buildability7%
45
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
100
Gas pipeline2%
94
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in SHARKEY, ranked by DC Readiness.

Sites near Greenfield (GERALD ANDRUS STATION - TINNIN)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110681Substation-Adjacent115 kV100 MW1.4 yrs62.7
Greenfield (GERALD ANDRUS STATION - TINNIN)Greenfield230 kV300 MW1.4 yrs60.1
Greenfield (GERALD ANDRUS STATION - TINNIN)Greenfield230 kV300 MW1.4 yrs56.9
EC FFE Sharkey CountyGreenfield1.4 yrs50.2
POLYCEM, LLC (RESILIENT FLOOR COVERING MANUFACTURING)Manufacturing46.2
SERVICE LUMBER CO. (READY-MIX CONCRETE MANUFACTURING)Manufacturing46.2
Delta Peanut WarehouseIndustrial42.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (GERALD ANDRUS STATION - TINNIN), SHARKEY. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.