Datacenter Sites in STONE, Mississippi

STONE has 23 scored datacenter candidate sites averaging 52.4/100 DC Readiness, with a catalogued aggregate of 1,800 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

23
Candidate sites
52.4/100
Avg DC Readiness
1,800 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for STONE

Yessales_tax_exemption
Datacenter tax incentive
11.87¢/kWh
Commercial electricity
8.44¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$3,998
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in STONE

Top datacenter sites in STONE
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110240Substation-Adjacent115 kV100 MW1.4 yrs65.3
TAP143370Substation-Adjacent115 kV100 MW1.4 yrs64.3
UNKNOWN110238Substation-Adjacent115 kV100 MW1.4 yrs63.5
UNKNOWN110318Substation-Adjacent115 kV100 MW1.4 yrs63.1
Greenfield (JACK WATSON - UNKNOWN110237)Greenfield230 kV300 MW1.4 yrs63.0
Greenfield (JACK WATSON - UNKNOWN110237)Greenfield230 kV300 MW1.4 yrs62.2
Greenfield (JACK WATSON - UNKNOWN110237)Greenfield230 kV300 MW1.4 yrs62.0
Greenfield (JACK WATSON - UNKNOWN110237)Greenfield230 kV300 MW1.4 yrs59.1
Greenfield (UNKNOWN110237 - UNKNOWN110240)Greenfield115 kV100 MW1.4 yrs54.4
Greenfield (UNKNOWN110318 - TAP141968)Greenfield115 kV100 MW1.4 yrs52.4
GENERAL DYNAMICS ORNAMENTALS (SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING)Manufacturing47.0
DESOTO TREATED MATERIALS, INC. (NOT AVAILABLE)Manufacturing47.0
CARPENTER'S POLE & PILING (NOT AVAILABLE)Manufacturing47.0
OWEN LOGGING CO., INC. (LOGGING)Manufacturing47.0
BALDWIN POLE MS, LLC (CUT STOCK, RESAWING LUMBER, AND PLANING)Manufacturing47.0
HOOD INDUSTRIES, INC. (SOFTWOOD VENEER AND PLYWOOD MANUFACTURING)Manufacturing47.0
A & D TIMBER CO., INC. (LOGGING)Manufacturing47.0
CELLU TISSUE-COSTAL PAPER (ALL OTHER CONVERTED PAPER PRODUCT MANUFACTURING)Manufacturing47.0
ATCO RUBBER PRODUCTS, INC. (NOT AVAILABLE)Manufacturing47.0
B & T CUSTOM WOODWORKS, INC. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing47.0
Mine SiteFormer Mine44.0
Mine SiteFormer Mine43.8
SMALL FRUIT RESEARCH STATIONFederal Excess38.6

STONE datacenter FAQ

How many datacenter sites are in STONE?
23 scored datacenter candidate sites, averaging 52.4/100 DC Readiness.
Does STONE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in STONE?
FEMA's National Risk Index rates STONE as "Relatively High" (score 45).
What are industrial electricity rates in STONE?
Average industrial electricity is 8.44¢/kWh and commercial is 11.87¢/kWh in STONE.

Dataset updated . Screening estimates derived from public data sources.