Greenfield (UNKNOWN110931 - TUNICA)

Greenfield

Tunica County, Mississippi · MISO

DC Readiness
48.5
Fair / 100

Greenfield (UNKNOWN110931 - TUNICA) is a greenfield datacenter candidate site in Tunica County, Mississippi, interconnecting through MISO. It screens at 48.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110931
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance37.5 mi
Fiber providers4
Fiber coverage3.9%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance394.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability50.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index105.3 (avg 100)

Location context

Nearest datacenterxAI Macrohardrr
DC distance32.5 mi
Nearest rail3.5 mi
Nearest gas pipeline6.8 mi
Nearest fiber route209.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.77¢/kWh
Industrial electricity7.19¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,274

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
48
Fiber connectivity12%
21
Energy cost10%
89
Water risk8%
82
Natural hazard8%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
62
Gas pipeline2%
78
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Tunica County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN110931 - TUNICA)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110931Substation-Adjacent115 kV100 MW1.4 yrs61.7
Greenfield (TUNICA - ROBINSONVILLE)Greenfield230 kV300 MW1.4 yrs61.6
HAMBRICKSubstation-Adjacent115 kV100 MW1.4 yrs60.4
Greenfield (UNKNOWN111260 - BATEVILLE)Greenfield230 kV300 MW1.4 yrs59.7
Greenfield (RITCHIE STATION - TUNICA)Greenfield230 kV300 MW1.4 yrs58.5
UNKNOWN111255Substation-Adjacent115 kV100 MW1.4 yrs58.2
Greenfield (UNKNOWN111260 - BATEVILLE)Greenfield230 kV300 MW1.4 yrs57.7
TUNICASubstation-Adjacent230 kV300 MW1.4 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN110931 - TUNICA), Tunica County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.