Greenfield (SIDNEY A MURRAY JR HYDROELECTR)

Greenfield

Wilkinson County, Mississippi · MISO

DC Readiness
53.6
Fair / 100

Greenfield (SIDNEY A MURRAY JR HYDROELECTR) is a greenfield datacenter candidate site in Wilkinson County, Mississippi, interconnecting through MISO. It screens at 53.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSIDNEY A MURRAY JR HYDROELECTRIC
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPVenyu BTR1
IXP distance56.5 mi
Fiber providers1
Fiber coverage2.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance322.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY LOUISIANA LLC
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index70.3 (avg 100)

Location context

Nearest datacenterVenyu BTR1
DC distance56.5 mi
Nearest rail13.6 mi
Nearest gas pipeline14.8 mi
Nearest fiber route139.8 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.24¢/kWh
Industrial electricity9.10¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,905

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
54
Fiber connectivity12%
39
Energy cost10%
88
Water risk8%
90
Natural hazard8%
45
Buildability7%
65
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
91
Gas pipeline2%
52
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Wilkinson County, ranked by DC Readiness.

Sites near Greenfield (SIDNEY A MURRAY JR HYDROELECTR)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110659Substation-Adjacent115 kV100 MW1.4 yrs58.0
EC FFE Wilkinson CountyGreenfield1.4 yrs54.9
Greenfield (TAP142912 - TAP142946)Greenfield115 kV100 MW1.4 yrs53.1
NETTERVILLE LUMBER CO., FRED (SAWMILLS)Manufacturing45.8
POLYMER RESEARCH CORP. (ALL OTHER BASIC INORGANIC CHEMICAL MANUFACTURING)Manufacturing45.8
Mine SiteFormer Mine43.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (SIDNEY A MURRAY JR HYDROELECTR), Wilkinson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.