Barry County, Missouri · ERCOT

DC Readiness
66.1
Good / 100

BEAVER is a substation-adjacent datacenter candidate site in Barry County, Missouri, interconnecting through ERCOT. It screens at 66.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBEAVER
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance30.0 mi
Fiber providers4
Fiber coverage59.4%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance301.5 mi

Site characteristics

Parcel ownerENTERGY ARKANSAS INC
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index60.7 (avg 100)

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance30.0 mi
Nearest rail1.9 mi
Nearest gas pipeline1.7 mi
Nearest fiber route59.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.03¢/kWh
Industrial electricity8.64¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,384

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
55
Fiber connectivity12%
65
Energy cost10%
92
Water risk8%
88
Natural hazard8%
62
Buildability7%
45
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
99
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Barry County, ranked by DC Readiness.

Sites near BEAVER
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117688Substation-Adjacent161 kV100 MW1.4 yrs66.9
Greenfield (UNKNOWN117688 - BEAVER)Greenfield161 kV100 MW3.4 yrs60.0
Greenfield (UNKNOWN117571 - UNKNOWN117688)Greenfield161 kV100 MW1.4 yrs57.8
EC FFE Barry CountyGreenfield1.4 yrs55.1
Davis & SonIndustrial42.5
Jumping Jacks Shoe Factory 1Industrial42.5
Dudley Tavern SiteIndustrial42.5
Jumping Jacks Shoe Factory Parking LotIndustrial42.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen