Curnow Chevrolet Building Site

Industrial

DeKalb County, Missouri · MISO

DC Readiness
42.7
Fair / 100

Curnow Chevrolet Building Site is a industrial datacenter candidate site in DeKalb County, Missouri, interconnecting through MISO. It screens at 42.7/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth34

Connectivity

Nearest IXPLincoln Rackhouse Kansas City
IXP distance39.5 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterCenturyLink
DC distance12.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.02¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,456

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
42
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in DeKalb County, ranked by DC Readiness.

Sites near Curnow Chevrolet Building Site
SiteTypeVoltageCapacityQueue waitScore
FAIRPORTSubstation-Adjacent345 kV600 MW3.5 yrs69.4
UNKNOWN117593Substation-Adjacent161 kV100 MW1.4 yrs66.3
UNKNOWN119996Substation-Adjacent161 kV100 MW1.4 yrs64.0
Greenfield (FAIRPORT - SAINT JOSEPH)Greenfield345 kV600 MW3.5 yrs63.1
Greenfield (FAIRPORT - SAINT JOSEPH)Greenfield345 kV600 MW3.5 yrs63.1
Greenfield (COOPER - FAIRPORT)Greenfield345 kV600 MW3.5 yrs62.2
Greenfield (FAIRPORT - SAINT JOSEPH)Greenfield345 kV600 MW3.5 yrs61.4
UNKNOWN117460Substation-Adjacent161 kV100 MW1.4 yrs60.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.