Datacenter Sites in Grundy, Missouri

Grundy has 17 scored datacenter candidate sites averaging 56.3/100 DC Readiness, with a catalogued aggregate of 304 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

17
Candidate sites
56.3/100
Avg DC Readiness
304 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for Grundy

Yessales_tax_exemption
Datacenter tax incentive
10.11¢/kWh
Commercial electricity
6.94¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$4,305
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in Grundy

Top datacenter sites in Grundy
SiteTypeVoltageCapacityQueue waitScore
Trenton DieselBrownfield4 MW1.4 yrs61.0
Greenfield (UNKNOWN117364 - UNKNOWN117493)Greenfield161 kV100 MW1.4 yrs60.6
EC Near Trenton DieselGreenfield1.4 yrs59.3
EC Near Trenton DieselGreenfield1.4 yrs59.1
EC Near Trenton DieselGreenfield1.4 yrs59.0
EC Near Trenton DieselGreenfield1.4 yrs58.6
EC Near Trenton DieselGreenfield1.4 yrs58.2
EC Near Trenton DieselGreenfield1.4 yrs57.9
EC Near Trenton DieselGreenfield1.4 yrs57.8
EC Near Trenton DieselGreenfield1.4 yrs56.9
EC Near Trenton DieselGreenfield1.4 yrs56.5
Greenfield (UNKNOWN117364 - UNKNOWN117493)Greenfield161 kV100 MW1.4 yrs55.8
Greenfield (UNKNOWN117364 - UNKNOWN117493)Greenfield161 kV100 MW1.4 yrs55.5
EC Near Trenton DieselGreenfield1.4 yrs53.7
EC Near Trenton DieselGreenfield1.4 yrs53.1
EC Near Trenton DieselGreenfield1.4 yrs50.6
Mine SiteFormer Mine43.3

Grundy datacenter FAQ

How many datacenter sites are in Grundy?
17 scored datacenter candidate sites, averaging 56.3/100 DC Readiness.
Does Grundy offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Grundy?
FEMA's National Risk Index rates Grundy as "Relatively High" (score 38).
What are industrial electricity rates in Grundy?
Average industrial electricity is 6.94¢/kWh and commercial is 10.11¢/kWh in Grundy.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen