Newton County, Missouri · MISO

DC Readiness
63.3
Good / 100

TAP149098 is a substation-adjacent datacenter candidate site in Newton County, Missouri, interconnecting through MISO. It screens at 63.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP149098
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance66.2 mi
Fiber providers10
Fiber coverage38.3%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance302.9 mi

Site characteristics

Parcel ownerEMPIRE DISTRICT ELECTRIC CO
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score47/100
Construction cost index71.9 (avg 100)

Location context

Nearest datacenterGoogle Pryor
DC distance64.6 mi
Nearest rail4.1 mi
Nearest gas pipeline0.4 mi
Nearest fiber route11.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.23¢/kWh
Industrial electricity8.23¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,732

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
48
Fiber connectivity12%
58
Energy cost10%
90
Water risk8%
91
Natural hazard8%
47
Buildability7%
75
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
90
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Newton County, ranked by DC Readiness.

Sites near TAP149098
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117571Substation-Adjacent161 kV100 MW1.4 yrs67.7
UNKNOWN117514Substation-Adjacent161 kV100 MW3.5 yrs66.1
Greenfield (UNKNOWN107928 - BROOKLINE)Greenfield345 kV600 MW3.4 yrs65.6
Greenfield (UNKNOWN107928 - BROOKLINE)Greenfield345 kV600 MW3.4 yrs65.5
Greenfield (UNKNOWN107928 - BROOKLINE)Greenfield345 kV600 MW3.4 yrs65.3
UNKNOWN121715Substation-Adjacent161 kV100 MW3.5 yrs65.2
TAP153764Substation-Adjacent161 kV100 MW3.5 yrs65.1
OZ NewtonGreenfield1.4 yrs60.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149098, Newton County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.