Reynolds County, Missouri · PJM

DC Readiness
57.1
Good / 100

TAP153683 is a substation-adjacent datacenter candidate site in Reynolds County, Missouri, interconnecting through PJM. It screens at 57.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP153683
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPTierPoint St. Louis – Millpark
IXP distance83.5 mi
Fiber providers2
Fiber coverage41.4%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance311.8 mi

Site characteristics

Parcel ownerUNION ELECTRIC CO - (MO)
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyClear
Hazard sub-score42/100
Construction cost index112.1 (avg 100)

Location context

Nearest datacenterTierPoint St. Louis – Millpark
DC distance83.5 mi
Nearest rail0.4 mi
Nearest gas pipeline24.8 mi
Nearest fiber route195.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.00¢/kWh
Industrial electricity7.53¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$2,655

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
44
Fiber connectivity12%
60
Energy cost10%
87
Water risk8%
88
Natural hazard8%
42
Buildability7%
45
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
57
Gas pipeline2%
20
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Reynolds County, ranked by DC Readiness.

Sites near TAP153683
SiteTypeVoltageCapacityQueue waitScore
TAP153680Substation-Adjacent345 kV600 MW4.6 yrs63.3
Greenfield (UNKNOWN117769 - UNKNOWN122781)Greenfield345 kV600 MW4.6 yrs61.2
Greenfield (UNKNOWN117769 - UNKNOWN122781)Greenfield345 kV600 MW4.6 yrs60.6
Greenfield (UNKNOWN117769 - UNKNOWN122781)Greenfield345 kV600 MW4.6 yrs60.4
TAP153691Substation-Adjacent138 kV100 MW4.6 yrs59.0
Greenfield (UNKNOWN117769 - TAP153680)Greenfield345 kV600 MW4.6 yrs57.8
UNKNOWN122833Substation-Adjacent138 kV100 MW4.6 yrs57.7
TAP153684Substation-Adjacent138 kV100 MW4.6 yrs57.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP153683, Reynolds County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.