UNKNOWN117874

Substation-Adjacent

Ste. Genevieve County, Missouri · PJM

DC Readiness
63.2
Good / 100

UNKNOWN117874 is a substation-adjacent datacenter candidate site in Ste. Genevieve County, Missouri, interconnecting through PJM. It screens at 63.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117874
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPCogent St Louis
IXP distance55.7 mi
Fiber providers4
Fiber coverage44.5%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance305.4 mi

Site characteristics

Parcel ownerCITIZENS ELECTRIC CORPORATION - (MO)
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteARCH PACKAGING TECHNOLOGIES
Hazard sub-score52/100
Construction cost index84.0 (avg 100)

Location context

Nearest datacenterTierPoint St Louis
DC distance55.8 mi
Nearest rail2.9 mi
Nearest gas pipeline8.6 mi
Nearest fiber route254.7 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.79¢/kWh
Industrial electricity6.95¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,393

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
44
Fiber connectivity12%
60
Energy cost10%
93
Water risk8%
91
Natural hazard8%
52
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
80
Gas pipeline2%
72
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Ste. Genevieve County, ranked by DC Readiness.

Sites near UNKNOWN117874
SiteTypeVoltageCapacityQueue waitScore
Greenfield (LUTESVILLE - ST FRANCOIS)Greenfield345 kV600 MW4.6 yrs61.8
Greenfield (LUTESVILLE - ST FRANCOIS)Greenfield345 kV600 MW4.6 yrs61.3
Greenfield (LUTESVILLE - ST FRANCOIS)Greenfield345 kV600 MW4.6 yrs60.4
Greenfield (UNKNOWN117893 - TAP139482)Greenfield138 kV100 MW4.6 yrs58.8
UNKNOWN117893Substation-Adjacent138 kV100 MW4.6 yrs58.7
Greenfield (UNKNOWN117874 - UNKNOWN117893)Greenfield138 kV100 MW4.6 yrs56.1
Greenfield (UNKNOWN117893 - TAP139482)Greenfield138 kV100 MW4.6 yrs51.4
Mine SiteFormer Mine42.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.