Humboldt, Nevada · WECC

DC Readiness
58.6
Good / 100

LONE TREE is a substation-adjacent datacenter candidate site in Humboldt, Nevada, interconnecting through WECC. It screens at 58.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationLONE TREE
Substation distance0.0 mi
Substation voltage120 kV
Available capacity100 MW
Utility commercial rate0.07¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait5.8 yrs
Recent queue wait5.8 yrs
Completion rate10%
Withdrawal rate90%

Connectivity

Nearest IXPSwitch Tahoe Reno
IXP distance148.7 mi
Fiber providers2
Fiber coverage52.2%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance279.3 mi

Site characteristics

Parcel ownerSIERRA PACIFIC POWER COMPANY
Land owner typeprivate
Buildability85.0/100
Land cover (NLCD)Barren Land

Risk & environment

Flood zoneZone X
Water stress (WRI)4.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteLONE TREE MINE
Hazard sub-score78/100
Construction cost index90.1 (avg 100)

Location context

Nearest datacenterTesla Gigafactory
DC distance146.5 mi
Nearest rail3.3 mi
Nearest gas pipeline16.7 mi
Nearest fiber route114.9 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity7.18¢/kWh
Industrial electricity10.22¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$1,164

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
57
Speed to power15%
31
Fiber connectivity12%
61
Energy cost10%
95
Water risk8%
39
Natural hazard8%
78
Buildability7%
85
Labor market4%
50
DC cluster4%
20
Land / acreage3%
69
Construction cost3%
75
Gas pipeline2%
46
Tax incentive2%
100
Climate / cooling2%
25

Nearby comparable sites

Other scored datacenter candidate sites in Humboldt, ranked by DC Readiness.

Sites near LONE TREE
SiteTypeVoltageCapacityQueue waitScore
VALMYSubstation-Adjacent345 kV600 MW5.8 yrs63.8
GETCHELSubstation-Adjacent120 kV100 MW5.8 yrs58.5
Greenfield (COYOTE CREEK - VALMY)Greenfield345 kV600 MW5.8 yrs58.4
WINNEMUCCASubstation-Adjacent120 kV100 MW5.8 yrs58.3
UNKNOWN304552Substation-Adjacent120 kV100 MW5.8 yrs57.8
Greenfield (COYOTE CREEK - VALMY)Greenfield345 kV600 MW5.8 yrs57.8
BLUE MOUNTAINSubstation-Adjacent120 kV100 MW5.8 yrs57.6
WinnemuccaBrownfield120 kV15 MW5.8 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LONE TREE, Humboldt. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.