Greenfield (BLACKWATER TIE - TAIBAN MESA)

Greenfield

Roosevelt County, New Mexico · ERCOT

DC Readiness
60.9
Good / 100

Greenfield (BLACKWATER TIE - TAIBAN MESA) is a greenfield datacenter candidate site in Roosevelt County, New Mexico, interconnecting through ERCOT. It screens at 60.9/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBLACKWATER TIE
Substation voltage345 kV
Available capacity600 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance112.9 mi
Fiber providers3
Fiber coverage90.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance400.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerFARMER'S ELECTIRC COOPERATIVE
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)4.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index48.5 (avg 100)

Location context

Nearest datacenterAligned Lubbock
DC distance106.7 mi
Nearest rail7.7 mi
Nearest gas pipeline12.1 mi
Nearest fiber route116.4 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity13.71¢/kWh
Industrial electricity10.08¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$1,039

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
56
Fiber connectivity12%
69
Energy cost10%
94
Water risk8%
20
Natural hazard8%
85
Buildability7%
70
Labor market4%
50
DC cluster4%
20
Land / acreage3%
54
Construction cost3%
100
Gas pipeline2%
61
Tax incentive2%
0
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Roosevelt County, ranked by DC Readiness.

Sites near Greenfield (BLACKWATER TIE - TAIBAN MESA)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN307428Substation-Adjacent230 kV300 MW3.4 yrs65.3
UNKNOWN304668Substation-Adjacent230 kV300 MW3.4 yrs64.3
UNKNOWN301294Substation-Adjacent115 kV100 MW3.4 yrs63.4
Greenfield (UNKNOWN307714 - EDDY AC-DC-AC )Greenfield345 kV600 MW3.4 yrs62.8
Greenfield (UNKNOWN304668 - OASIS)Greenfield230 kV300 MW3.4 yrs62.3
Greenfield (UNKNOWN307714 - EDDY AC-DC-AC )Greenfield345 kV600 MW3.4 yrs62.2
Greenfield (UNKNOWN307714 - EDDY AC-DC-AC )Greenfield345 kV600 MW3.4 yrs62.0
Greenfield (UNKNOWN307714 - EDDY AC-DC-AC )Greenfield345 kV600 MW3.4 yrs61.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (BLACKWATER TIE - TAIBAN MESA), Roosevelt County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.