Columbia County, New York · NYISO

DC Readiness
60.6
Good / 100

TAP135691 is a substation-adjacent datacenter candidate site in Columbia County, New York, interconnecting through NYISO. It screens at 60.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP135691
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneNYISO_MHK_VL
Wholesale LMP$56.43/MWh
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionNYISO
Queue depth426
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXPCyrusOne Wappingers Falls
IXP distance34.9 mi
Fiber providers10
Fiber coverage67.0%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance287.1 mi

Site characteristics

Parcel ownerNIAGARA MOHAWK POWER CORP.
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index79.2 (avg 100)

Location context

Nearest datacenterCyrusOne Wappingers Falls
DC distance34.9 mi
Nearest rail6.8 mi
Nearest gas pipeline1.1 mi
Nearest fiber route100.8 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.36¢/kWh
Industrial electricity6.53¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$6,536

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
26
Fiber connectivity12%
64
Energy cost10%
67
Water risk8%
92
Natural hazard8%
65
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
84
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Columbia County, ranked by DC Readiness.

Sites near TAP135691
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN128944Substation-Adjacent115 kV100 MW3.5 yrs63.9
TAP136127Substation-Adjacent115 kV100 MW3.5 yrs63.8
Greenfield (NEW SCOTLAND - TAP136075)Greenfield345 kV600 MW3.5 yrs63.1
TAP136126Substation-Adjacent115 kV100 MW3.5 yrs63.0
ESSEXSubstation-Adjacent230 kV300 MW3.5 yrs62.7
UNKNOWN129013Substation-Adjacent115 kV100 MW3.5 yrs62.0
ATHENSSubstation-Adjacent345 kV600 MW3.5 yrs61.8
TAP136125Substation-Adjacent115 kV100 MW3.5 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP135691, Columbia County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.