Greenfield (UNKNOWN111199 - MCGUIRE)

Greenfield

Cleveland County, North Carolina · SERC

DC Readiness
68.8
Good / 100

Greenfield (UNKNOWN111199 - MCGUIRE) is a greenfield datacenter candidate site in Cleveland County, North Carolina, interconnecting through SERC. It screens at 68.8/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN111199
Substation voltage500 kV
Available capacity1,000 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPT5@Charlotte
IXP distance11.3 mi
Fiber providers5
Fiber coverage30.3%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance172.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerDUKE ENERGY CAROLINAS, LLC
Land owner typeprivate
Buildability50.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index79.1 (avg 100)

Location context

Nearest datacenterT5 Charlotte Campus
DC distance11.3 mi
Nearest rail1.5 mi
Nearest gas pipeline6.0 mi
Nearest fiber route133.2 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.05¢/kWh
Industrial electricity7.86¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$6,086

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
67
Fiber connectivity12%
52
Energy cost10%
90
Water risk8%
84
Natural hazard8%
58
Buildability7%
50
Labor market4%
50
DC cluster4%
85
Land / acreage3%
60
Construction cost3%
84
Gas pipeline2%
81
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Cleveland County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN111199 - MCGUIRE)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111199Substation-Adjacent500 kV1,000 MW3.7 yrs79.9
JAMES E. ROGERS ENERGY COMPLEXSubstation-Adjacent500 kV1,000 MW3.7 yrs77.6
SHELBY TIESubstation-Adjacent230 kV300 MW3.7 yrs73.9
Greenfield (CLIFFSIDE - SHELBY TIE)Greenfield230 kV300 MW3.7 yrs68.2
Greenfield (UNKNOWN111199 - MCGUIRE)Greenfield500 kV1,000 MW3.7 yrs67.8
UNKNOWN111310Substation-Adjacent100 kV50 MW4.3 yrs64.7
UNKNOWN111308Substation-Adjacent100 kV50 MW4.3 yrs64.5
UNKNOWN111317Substation-Adjacent100 kV50 MW3.7 yrs63.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN111199 - MCGUIRE), Cleveland County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.