Greenfield (STAMEY - MITCHELL RIVER)

Greenfield

Yadkin County, North Carolina · PJM

DC Readiness
54.2
Fair / 100

Greenfield (STAMEY - MITCHELL RIVER) is a greenfield datacenter candidate site in Yadkin County, North Carolina, interconnecting through PJM. It screens at 54.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSTAMEY
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance41.6 mi
Fiber providers6
Fiber coverage89.4%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance103.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerWagoner Leo C (Le) Et Ux Wagoner Doretha G (Le)
Parcel APN485600752141
Land owner typeprivate
Buildability25.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score43/100
Construction cost index77.7 (avg 100)

Location context

Nearest datacenter801 Main Street - Lenoir
DC distance41.6 mi
Nearest rail8.5 mi
Nearest gas pipeline21.4 mi
Nearest fiber route81.2 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.45¢/kWh
Industrial electricity10.10¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$6,239

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
35
Fiber connectivity12%
57
Energy cost10%
82
Water risk8%
89
Natural hazard8%
43
Buildability7%
25
Labor market4%
50
DC cluster4%
45
Land / acreage3%
60
Construction cost3%
85
Gas pipeline2%
31
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Yadkin County, ranked by DC Readiness.

Sites near Greenfield (STAMEY - MITCHELL RIVER)
SiteTypeVoltageCapacityQueue waitScore
MITCHELL RIVERSubstation-Adjacent230 kV300 MW4.3 yrs67.2
Greenfield (UNKNOWN115091 - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs61.0
UNKNOWN110816Substation-Adjacent100 kV50 MW4.3 yrs61.0
Greenfield (STAMEY - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs59.8
Greenfield (STAMEY - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs59.7
UNKNOWN110824Substation-Adjacent100 kV50 MW4.3 yrs59.7
Greenfield (STAMEY - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs59.4
Greenfield (UNKNOWN115091 - MITCHELL RIVER)Greenfield230 kV300 MW4.3 yrs59.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (STAMEY - MITCHELL RIVER), Yadkin County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.