Former Astatic Property - Broad and Jackson

Industrial

Ashtabula County, Ohio · PJM

DC Readiness
43.8
Fair / 100

Former Astatic Property - Broad and Jackson is a industrial datacenter candidate site in Ashtabula County, Ohio, interconnecting through PJM. It screens at 43.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth9

Connectivity

Nearest IXPBlueBridge Networks | Mayfield Heights Data Center
IXP distance56.1 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterBlueBridge Networks | Mayfield Heights Data Center
DC distance56.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.21¢/kWh
Industrial electricity7.60¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$5,435

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
48
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Ashtabula County, ranked by DC Readiness.

Sites near Former Astatic Property - Broad and Jackson
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN113675Substation-Adjacent345 kV600 MW3.2 yrs74.3
TAP136893Substation-Adjacent345 kV600 MW3.2 yrs74.2
UNKNOWN113676Substation-Adjacent138 kV100 MW3.2 yrs69.6
UNKNOWN112767Substation-Adjacent138 kV100 MW3.2 yrs68.9
ERIE WESTSubstation-Adjacent345 kV600 MW3.2 yrs68.9
UNKNOWN113753Substation-Adjacent138 kV100 MW3.2 yrs68.4
Greenfield (TAP136893 - ERIE WEST)Greenfield345 kV600 MW3.2 yrs66.8
UNKNOWN116065Substation-Adjacent138 kV100 MW3.2 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Former Astatic Property - Broad and Jackson, Ashtabula County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.