Brown County, Ohio · PJM

DC Readiness
62.9
Good / 100

TAP171326 is a substation-adjacent datacenter candidate site in Brown County, Ohio, interconnecting through PJM. It screens at 62.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP171326
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPCyrusOne Mason
IXP distance42.3 mi
Fiber providers6
Fiber coverage11.8%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance83.9 mi

Site characteristics

Parcel ownerSlouffman Richard Etal
Parcel APN160263040000
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index77.4 (avg 100)

Location context

Nearest datacenterCyrusOne Cincinnati-Mason CIN3
DC distance42.3 mi
Nearest rail4.9 mi
Nearest gas pipeline16.5 mi
Nearest fiber route27.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.57¢/kWh
Industrial electricity5.92¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$5,850

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
51
Fiber connectivity12%
51
Energy cost10%
91
Water risk8%
90
Natural hazard8%
70
Buildability7%
45
Labor market4%
50
DC cluster4%
50
Land / acreage3%
46
Construction cost3%
86
Gas pipeline2%
47
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Brown County, ranked by DC Readiness.

Sites near TAP171326
SiteTypeVoltageCapacityQueue waitScore
HILLCREST SOLARSubstation-Adjacent345 kV600 MW3.2 yrs70.3
Greenfield (UNKNOWN113606 - PIERCE)Greenfield345 kV600 MW3.2 yrs65.9
Greenfield (UNKNOWN113606 - PIERCE)Greenfield345 kV600 MW3.2 yrs65.5
Greenfield (TAP137802 - PIERCE)Greenfield345 kV600 MW3.2 yrs65.5
Greenfield (J M STUART - UNKNOWN113907)Greenfield345 kV600 MW3.2 yrs64.9
Greenfield (J M STUART - UNKNOWN113907)Greenfield345 kV600 MW3.2 yrs64.3
UNKNOWN137359Substation-Adjacent138 kV100 MW3.2 yrs64.1
Greenfield (UNKNOWN113606 - PIERCE)Greenfield345 kV600 MW3.2 yrs63.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP171326, Brown County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.