Arcanum Peaking

Brownfield

Darke, Ohio · PJM

DC Readiness
55.2
Good / 100

Arcanum Peaking is a brownfield datacenter candidate site in Darke, Ohio, interconnecting through PJM. It screens at 55.2/100 DC Readiness with a catalogued 2 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Available capacity2 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPEncore Technologies MSB1
IXP distance30.8 mi
Fiber providers9
Fiber coverage43.0%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance82.2 mi

Site characteristics

Site typeBrownfield
Parcel ownerVillage Of Arcanum
Parcel APNP59230809010211900
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former useoil
Existing capacity2 MW
Retirement date2022-09-01

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCREATIVE CABINETS
Hazard sub-score60/100
Construction cost index81.8 (avg 100)

Location context

Nearest datacenterEncore Technologies MSB1
DC distance30.8 mi
Nearest rail6.6 mi
Nearest gas pipeline3.3 mi
Nearest fiber route25.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.45¢/kWh
Industrial electricity7.94¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$10,913

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
23
Speed to power15%
41
Fiber connectivity12%
22
Energy cost10%
91
Water risk8%
92
Natural hazard8%
60
Buildability7%
92
Labor market4%
50
DC cluster4%
70
Land / acreage3%
54
Construction cost3%
82
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Darke, ranked by DC Readiness.

Sites near Arcanum Peaking
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN114766Substation-Adjacent138 kV100 MW3.2 yrs67.7
EC Near Arcanum PeakingGreenfield3.2 yrs61.2
EC Near Arcanum PeakingGreenfield3.2 yrs60.4
EC Near Arcanum PeakingGreenfield3.2 yrs60.2
EC Near Arcanum PeakingGreenfield3.2 yrs59.3
EC Near Arcanum PeakingGreenfield3.2 yrs58.8
EC Near Arcanum PeakingGreenfield3.2 yrs58.7
EC Near Arcanum PeakingGreenfield3.2 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Arcanum Peaking, Darke. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.