UNKNOWN137852 is a substation-adjacent datacenter candidate site in Lawrence County, Ohio, interconnecting through PJM. It screens at 66.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN137852
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.15¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPSecureNet DC1
IXP distance58.0 mi
Fiber providers3
Fiber coverage4.1%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance90.4 mi

Site characteristics

Parcel ownerUnited States Of America Washdc
Parcel APN04-010-1300.000
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index96.0 (avg 100)

Location context

Nearest datacenterSecureNet DC1
DC distance58.0 mi
Nearest rail8.3 mi
Nearest gas pipeline6.0 mi
Nearest fiber route153.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.98¢/kWh
Industrial electricity11.51¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$3,357

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
51
Fiber connectivity12%
45
Energy cost10%
91
Water risk8%
85
Natural hazard8%
70
Buildability7%
100
Labor market4%
50
DC cluster4%
50
Land / acreage3%
50
Construction cost3%
70
Gas pipeline2%
81
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Lawrence County, ranked by DC Readiness.

Sites near UNKNOWN137852
SiteTypeVoltageCapacityQueue waitScore
BAKERSubstation-Adjacent765 kV1,000 MW3.2 yrs70.3
Greenfield (NORTH PROCTORVILLE SUBSTATION )Greenfield765 kV1,000 MW3.2 yrs67.6
NORTH PROCTORVILLE SUBSTATIONSubstation-Adjacent765 kV1,000 MW3.2 yrs65.7
TAP137840Substation-Adjacent138 kV100 MW3.2 yrs65.3
TAP137841Substation-Adjacent138 kV100 MW3.2 yrs63.9
BELLEFONTESubstation-Adjacent138 kV100 MW3.2 yrs63.3
UNKNOWN116516Substation-Adjacent138 kV100 MW3.2 yrs62.4
UNKNOWN116520Substation-Adjacent138 kV100 MW3.2 yrs62.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN137852, Lawrence County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.