UNKNOWN116763 is a substation-adjacent datacenter candidate site in Monroe County, Ohio, interconnecting through PJM. It screens at 66.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN116763
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPCitynet Bridgeport
IXP distance62.0 mi
Fiber providers6
Fiber coverage55.1%
Nearest cloud providerGCP
Nearest cloud regionus-east5
Cloud region distance71.2 mi

Site characteristics

Parcel ownerBailey Earl E & Judy A
Parcel APN37-00203.000
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index96.5 (avg 100)

Location context

Nearest datacenterCitynet Bridgeport
DC distance62.0 mi
Nearest rail5.5 mi
Nearest gas pipeline2.5 mi
Nearest fiber route51.3 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.94¢/kWh
Industrial electricity9.75¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$4,184

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
51
Fiber connectivity12%
62
Energy cost10%
84
Water risk8%
92
Natural hazard8%
70
Buildability7%
75
Labor market4%
50
DC cluster4%
50
Land / acreage3%
64
Construction cost3%
70
Gas pipeline2%
92
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Monroe County, ranked by DC Readiness.

Sites near UNKNOWN116763
SiteTypeVoltageCapacityQueue waitScore
KAMMER (138KV)Substation-Adjacent345 kV600 MW3.2 yrs69.9
UNKNOWN151772Substation-Adjacent138 kV100 MW3.2 yrs67.0
Greenfield (KAMMER (138KV) - WASHINGTON EN)Greenfield345 kV600 MW3.2 yrs66.9
UNKNOWN116760Substation-Adjacent138 kV100 MW3.2 yrs66.9
TAP150325Substation-Adjacent138 kV100 MW3.2 yrs66.4
Greenfield (KAMMER (138KV) - WASHINGTON EN)Greenfield345 kV600 MW3.2 yrs65.8
Greenfield (KAMMER (138KV) - MUSKINGUM RIV)Greenfield345 kV600 MW3.2 yrs65.0
Greenfield (KAMMER (138KV) - WASHINGTON EN)Greenfield345 kV600 MW3.2 yrs64.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN116763, Monroe County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.