Beaver County, Oklahoma · SPP

DC Readiness
61.0
Good / 100

COLE is a substation-adjacent datacenter candidate site in Beaver County, Oklahoma, interconnecting through SPP. It screens at 61.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCOLE
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneSPP_SOUTH
Wholesale LMP$15.62/MWh
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionSPP
Queue depth87
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance113.0 mi
Fiber providers1
Fiber coverage84.6%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance351.0 mi

Site characteristics

Parcel ownerTRI-COUNTY ELECTRIC COOP, INC
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index88.0 (avg 100)

Location context

Nearest datacenterAmarillo Petroleum Building
DC distance113.0 mi
Nearest rail14.2 mi
Nearest gas pipeline0.5 mi
Nearest fiber route26.1 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.99¢/kWh
Industrial electricity8.48¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$1,100

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
40
Fiber connectivity12%
61
Energy cost10%
95
Water risk8%
74
Natural hazard8%
58
Buildability7%
70
Labor market4%
50
DC cluster4%
20
Land / acreage3%
62
Construction cost3%
77
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Beaver County, ranked by DC Readiness.

Sites near COLE
SiteTypeVoltageCapacityQueue waitScore
Greenfield (WOODWARD - BEAVER COUNTY)Greenfield345 kV600 MW3.4 yrs63.8
Greenfield (WOODWARD - BEAVER COUNTY)Greenfield345 kV600 MW3.4 yrs63.8
Greenfield (WOODWARD - BEAVER COUNTY)Greenfield345 kV600 MW3.4 yrs63.5
Greenfield (WOODWARD - BEAVER COUNTY)Greenfield345 kV600 MW3.4 yrs63.4
UNKNOWN118716Substation-Adjacent115 kV100 MW3.5 yrs62.9
Greenfield (WOODWARD - BEAVER COUNTY)Greenfield345 kV600 MW3.4 yrs62.2
Greenfield (WOODWARD - BEAVER COUNTY)Greenfield345 kV600 MW3.4 yrs61.6
UNKNOWN118714Substation-Adjacent115 kV100 MW3.5 yrs61.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for COLE, Beaver County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.