AES SHADY POINT LLC

Substation-Adjacent

Le Flore County, Oklahoma · ERCOT

DC Readiness
65.8
Good / 100

AES SHADY POINT LLC is a substation-adjacent datacenter candidate site in Le Flore County, Oklahoma, interconnecting through ERCOT. It screens at 65.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationAES SHADY POINT LLC
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPLake Region Technology & Communications
IXP distance59.6 mi
Fiber providers11
Fiber coverage46.7%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance206.3 mi

Site characteristics

Parcel ownerOKLAHOMA GAS & ELECTRIC CO
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index60.2 (avg 100)

Location context

Nearest datacenterDatacenter 01387080629
DC distance56.3 mi
Nearest rail1.4 mi
Nearest gas pipeline1.6 mi
Nearest fiber route21.7 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.03¢/kWh
Industrial electricity6.75¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,896

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
56
Fiber connectivity12%
63
Energy cost10%
93
Water risk8%
77
Natural hazard8%
58
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
100
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Le Flore County, ranked by DC Readiness.

Sites near AES SHADY POINT LLC
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN119119Substation-Adjacent161 kV100 MW3.4 yrs64.8
TAP149548Substation-Adjacent161 kV100 MW3.4 yrs62.2
UNKNOWN119120Substation-Adjacent161 kV100 MW3.4 yrs60.1
Greenfield (TAP149548 - TAP149655)Greenfield161 kV100 MW3.4 yrs58.1
OZ Le FloreGreenfield3.5 yrs57.2
EC Coal Le Flore CountyGreenfield3.5 yrs56.6
EC Coal Le Flore CountyGreenfield3.5 yrs53.9
EC Coal Le Flore CountyGreenfield3.5 yrs53.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.