Greenfield (NORTHEASTERN - TAP148867)

Greenfield

Washington County, Oklahoma · ERCOT

DC Readiness
60.7
Good / 100

Greenfield (NORTHEASTERN - TAP148867) is a greenfield datacenter candidate site in Washington County, Oklahoma, interconnecting through ERCOT. It screens at 60.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationNORTHEASTERN
Substation voltage138 kV
Available capacity100 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPOneNet OSU Tulsa
IXP distance30.8 mi
Fiber providers7
Fiber coverage70.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance268.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerPUBLIC SERVICE CO OF OKLAHOMA
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index69.6 (avg 100)

Location context

Nearest datacenterCherokee Data Center
DC distance22.9 mi
Nearest rail6.1 mi
Nearest gas pipeline3.6 mi
Nearest fiber route29.7 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.57¢/kWh
Industrial electricity8.04¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,791

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
56
Fiber connectivity12%
68
Energy cost10%
92
Water risk8%
70
Natural hazard8%
58
Buildability7%
80
Labor market4%
50
DC cluster4%
60
Land / acreage3%
51
Construction cost3%
92
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near Greenfield (NORTHEASTERN - TAP148867)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN119444Substation-Adjacent138 kV100 MW3.4 yrs68.0
UNKNOWN119374Substation-Adjacent138 kV100 MW3.4 yrs65.3
TAP148867Substation-Adjacent138 kV100 MW3.5 yrs65.1
UNKNOWN119383Substation-Adjacent138 kV100 MW3.5 yrs64.6
UNKNOWN119356Substation-Adjacent138 kV100 MW3.5 yrs64.0
TAP149683Substation-Adjacent138 kV100 MW3.5 yrs63.8
UNKNOWN118327Substation-Adjacent138 kV100 MW3.5 yrs63.8
UNKNOWN119445Substation-Adjacent138 kV100 MW3.5 yrs63.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (NORTHEASTERN - TAP148867), Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.