Greenfield (WREN - TOLEDO)

Greenfield

Lincoln County, Oregon · WECC

DC Readiness
59.1
Good / 100

Greenfield (WREN - TOLEDO) is a greenfield datacenter candidate site in Lincoln County, Oregon, interconnecting through WECC. It screens at 59.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWREN
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPPeak Internet
IXP distance19.5 mi
Fiber providers6
Fiber coverage28.3%
Nearest cloud providerAWS
Nearest cloud regionus-west-2
Cloud region distance99.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerCONSUMERS POWER, INC
Land owner typeprivate
Buildability50.0/100
Land cover (NLCD)Mixed Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)2.00
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index69.4 (avg 100)

Location context

Nearest datacenterPeak Internet
DC distance19.5 mi
Nearest rail3.6 mi
Nearest gas pipeline8.5 mi
Nearest fiber route69.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.26¢/kWh
Industrial electricity7.23¢/kWh
Cooling degree days300
Heating degree days4,700
Land price / acre$7,580

Incentive detail: Enterprise Zone property tax exemption for 3-15 years; no sales tax in Oregon.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
32
Fiber connectivity12%
65
Energy cost10%
94
Water risk8%
60
Natural hazard8%
58
Buildability7%
50
Labor market4%
50
DC cluster4%
65
Land / acreage3%
43
Construction cost3%
92
Gas pipeline2%
73
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Lincoln County, ranked by DC Readiness.

Sites near Greenfield (WREN - TOLEDO)
SiteTypeVoltageCapacityQueue waitScore
WENDSONSubstation-Adjacent230 kV300 MW1.7 yrs66.1
AGATE BEACH SS 108Substation-Adjacent115 kV100 MW1.7 yrs62.8
STEENSEN SS 109Substation-Adjacent115 kV100 MW1.7 yrs62.5
TOLEDOSubstation-Adjacent230 kV300 MW1.7 yrs62.1
Greenfield (WREN - TOLEDO)Greenfield230 kV300 MW1.7 yrs61.8
FLORENCESubstation-Adjacent115 kV100 MW1.7 yrs61.7
DEPOE BAYSubstation-Adjacent115 kV100 MW1.7 yrs61.4
DEVILS LAKESubstation-Adjacent115 kV100 MW1.7 yrs61.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (WREN - TOLEDO), Lincoln County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.