Georgetown County, South Carolina · SERC

DC Readiness
65.8
Good / 100

TAP146853 is a substation-adjacent datacenter candidate site in Georgetown County, South Carolina, interconnecting through SERC. It screens at 65.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP146853
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPDC BLOX MYR1 - DCBLOX Myrtle Beach
IXP distance25.2 mi
Fiber providers6
Fiber coverage43.9%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance50.1 mi

Site characteristics

Parcel ownerDUKE ENERGY PROGRESS - (NC)
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score60/100
Construction cost index73.7 (avg 100)

Location context

Nearest datacenterDC BLOX Myrtle Beach Cable Landing Station
DC distance25.1 mi
Nearest rail5.3 mi
Nearest gas pipeline7.9 mi
Nearest fiber route163.9 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.95¢/kWh
Industrial electricity8.52¢/kWh
Cooling degree days2,000
Heating degree days2,400
Land price / acre$2,960

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
67
Fiber connectivity12%
63
Energy cost10%
91
Water risk8%
89
Natural hazard8%
60
Buildability7%
40
Labor market4%
50
DC cluster4%
70
Land / acreage3%
51
Construction cost3%
89
Gas pipeline2%
75
Tax incentive2%
100
Climate / cooling2%
25

Nearby comparable sites

Other scored datacenter candidate sites in Georgetown County, ranked by DC Readiness.

Sites near TAP146853
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121178Substation-Adjacent230 kV300 MW3.7 yrs73.5
TAP146899Substation-Adjacent115 kV100 MW3.7 yrs70.6
UNKNOWN146898Substation-Adjacent115 kV100 MW3.7 yrs70.4
TAP146688Substation-Adjacent115 kV100 MW3.7 yrs70.0
UNKNOWN146888Substation-Adjacent115 kV100 MW3.7 yrs69.9
UNKNOWN121331Substation-Adjacent230 kV300 MW3.7 yrs69.4
TAP146885Substation-Adjacent115 kV100 MW3.7 yrs69.2
UNKNOWN122751Substation-Adjacent115 kV100 MW3.7 yrs69.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP146853, Georgetown County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.