UNKNOWN109517

Substation-Adjacent

Campbell County, Tennessee · SERC

DC Readiness
63.6
Good / 100

UNKNOWN109517 is a substation-adjacent datacenter candidate site in Campbell County, Tennessee, interconnecting through SERC. It screens at 63.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN109517
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPPeace Communications KNX1
IXP distance33.8 mi
Fiber providers5
Fiber coverage32.7%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance254.0 mi

Site characteristics

Parcel ownerTENNESSEE VALLEY AUTHORITY
Land owner typeprivate
Buildability85.0/100
Land cover (NLCD)Barren Land

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteR L CARRIERS AT TRAVEL CENTERS OF AMERICA TA 255
Hazard sub-score52/100
Construction cost index69.3 (avg 100)

Location context

Nearest datacenterFrontier (supercomputer)
DC distance31.3 mi
Nearest rail1.7 mi
Nearest gas pipeline25.6 mi
Nearest fiber route27.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.01¢/kWh
Industrial electricity6.07¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$5,131

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
67
Fiber connectivity12%
40
Energy cost10%
90
Water risk8%
82
Natural hazard8%
52
Buildability7%
85
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
92
Gas pipeline2%
18
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Campbell County, ranked by DC Readiness.

Sites near UNKNOWN109517
SiteTypeVoltageCapacityQueue waitScore
LAFOLLETTESubstation-Adjacent161 kV100 MW3.7 yrs66.7
TAP155065Substation-Adjacent161 kV100 MW3.7 yrs64.8
JACKSBOROSubstation-Adjacent161 kV100 MW3.7 yrs64.4
CARYVILLESubstation-Adjacent161 kV100 MW3.7 yrs64.0
SWEET GUM FLATSSubstation-Adjacent161 kV100 MW3.7 yrs62.5
EC Coal Campbell CountyGreenfield3.7 yrs62.4
Greenfield (NORRIS DAM - LAFOLLETTE)Greenfield161 kV100 MW3.7 yrs62.3
Greenfield (NORRIS DAM - TAP152130)Greenfield161 kV100 MW3.7 yrs61.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN109517, Campbell County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.