Datacenter Sites in Nacogdoches, Texas
Nacogdoches has 48 scored datacenter candidate sites averaging 54.9/100 DC Readiness, with a catalogued aggregate of 7,600 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
48
Candidate sites
54.9/100
Avg DC Readiness
7,600 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
Site-selection context for Nacogdoches
Yessales_tax_exemption
Datacenter tax incentive
12.25¢/kWh
Commercial electricity
6.66¢/kWh
Industrial electricity
5
Fiber providers
Medium-High
Water stress
$4,382
Land price / acre
2,600
Cooling degree days
1,800
Heating degree days
65°F
Mean annual temp
Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
By site type
Top datacenter sites in Nacogdoches
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| NACOGDOCHES | Substation-Adjacent | 345 kV | 600 MW | 3.4 yrs | 65.4 |
| TAP308161 | Substation-Adjacent | 138 kV | 100 MW | 3.4 yrs | 62.9 |
| UNKNOWN300986 | Substation-Adjacent | 138 kV | 100 MW | 3.4 yrs | 62.5 |
| UNKNOWN305644 | Substation-Adjacent | 138 kV | 100 MW | 3.4 yrs | 62.4 |
| UNKNOWN312601 | Substation-Adjacent | 345 kV | 600 MW | 3.4 yrs | 62.4 |
| UNKNOWN300175 | Substation-Adjacent | 138 kV | 100 MW | 3.4 yrs | 62.3 |
| TAP312602 | Substation-Adjacent | 345 kV | 600 MW | 3.4 yrs | 61.9 |
| Greenfield (TAP312602 - STRYKER CREEK) | Greenfield | 345 kV | 600 MW | 3.4 yrs | 61.8 |
| Greenfield (TAP312602 - STRYKER CREEK) | Greenfield | 345 kV | 600 MW | 3.4 yrs | 61.4 |
| TAP302764 | Substation-Adjacent | 138 kV | 100 MW | 3.4 yrs | 61.2 |
| UNKNOWN312063 | Substation-Adjacent | 138 kV | 100 MW | 3.4 yrs | 60.3 |
| Greenfield (NACOGDOCHES - UNKNOWN308218) | Greenfield | 345 kV | 600 MW | 3.4 yrs | 60.1 |
| Greenfield (NACOGDOCHES - UNKNOWN308218) | Greenfield | 345 kV | 600 MW | 3.4 yrs | 59.4 |
| TAP312619 | Substation-Adjacent | 138 kV | 100 MW | 3.4 yrs | 58.7 |
| Greenfield (NACOGDOCHES - UNKNOWN308218) | Greenfield | 345 kV | 600 MW | 3.4 yrs | 58.7 |
| Greenfield (TAP312602 - STRYKER CREEK) | Greenfield | 345 kV | 600 MW | 3.4 yrs | 57.2 |
| OZ Nacogdoches | Greenfield | — | — | 3.4 yrs | 57.0 |
| EC Near Nacogdoches Power | Greenfield | — | — | 3.4 yrs | 56.7 |
| Greenfield (None - STRYKER CREEK) | Greenfield | 138 kV | 100 MW | 3.4 yrs | 56.1 |
| Greenfield (UNKNOWN312063 - UNKNOWN300986) | Greenfield | 138 kV | 100 MW | 3.4 yrs | 55.5 |
| Greenfield (UNKNOWN309176 - NACOGDOCHES) | Greenfield | 138 kV | 100 MW | 3.4 yrs | 55.5 |
| Greenfield (None - STRYKER CREEK) | Greenfield | 138 kV | 100 MW | 3.4 yrs | 55.2 |
| Greenfield (UNKNOWN300986 - UNKNOWN305815) | Greenfield | 138 kV | 100 MW | 3.4 yrs | 55.1 |
| EC Near Nacogdoches Power | Greenfield | — | — | 3.4 yrs | 55.0 |
| EC Near Nacogdoches Power | Greenfield | — | — | 3.4 yrs | 54.4 |
Nacogdoches datacenter FAQ
- How many datacenter sites are in Nacogdoches?
- 48 scored datacenter candidate sites, averaging 54.9/100 DC Readiness.
- Does Nacogdoches offer datacenter tax incentives?
- Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
- What is the natural-hazard risk in Nacogdoches?
- FEMA's National Risk Index rates Nacogdoches as "Very High" (score 55).
- What are industrial electricity rates in Nacogdoches?
- Average industrial electricity is 6.66¢/kWh and commercial is 12.25¢/kWh in Nacogdoches.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Nacogdoches, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.