Davis County, Utah · WECC

DC Readiness
65.1
Good / 100

TAP206386 is a substation-adjacent datacenter candidate site in Davis County, Utah, interconnecting through WECC. It screens at 65.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP206386
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPLowest Host/Empire Technology
IXP distance16.3 mi
Fiber providers13
Fiber coverage76.2%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance18.8 mi

Site characteristics

Parcel ownerPACIFICORP
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCHEVRON USA 78049 MICHAEL TOOLSON CHEV
Hazard sub-score75/100
Construction cost index82.5 (avg 100)

Location context

Nearest datacenterLowest Host/Empire Technology
DC distance16.3 mi
Nearest rail2.5 mi
Nearest gas pipeline6.3 mi
Nearest fiber route121.1 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.95¢/kWh
Industrial electricity7.91¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$14,480

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
34
Fiber connectivity12%
83
Energy cost10%
96
Water risk8%
51
Natural hazard8%
75
Buildability7%
75
Labor market4%
50
DC cluster4%
75
Land / acreage3%
31
Construction cost3%
81
Gas pipeline2%
80
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Davis County, ranked by DC Readiness.

Sites near TAP206386
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN206367Substation-Adjacent230 kV300 MW1.7 yrs72.6
UNKNOWN206369Substation-Adjacent230 kV300 MW1.7 yrs71.6
TAP206717Substation-Adjacent230 kV300 MW1.7 yrs71.2
SYRACUSESubstation-Adjacent345 kV600 MW1.7 yrs69.5
UNKNOWN206363Substation-Adjacent230 kV300 MW1.7 yrs68.8
UNKNOWN201787Substation-Adjacent230 kV300 MW1.7 yrs68.8
UNKNOWN206405Substation-Adjacent230 kV300 MW1.7 yrs68.6
UNKNOWN201792Substation-Adjacent230 kV300 MW1.7 yrs68.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP206386, Davis County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.