EC Near Covington Facility
GreenfieldALLEGHANY, Virginia · PJM
EC Near Covington Facility is a greenfield datacenter candidate site in ALLEGHANY, Virginia, interconnecting through PJM. It screens at 52.9/100 DC Readiness and a 3.1 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in ALLEGHANY, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN121391 | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 64.4 |
| Covington Facility | Brownfield | — | 27 MW | 3.1 yrs | 60.5 |
| OZ Alleghany | Greenfield | — | — | 3.1 yrs | 59.0 |
| Greenfield (FUDGE HOLLOW - RONCEVERTE) | Greenfield | 138 kV | 100 MW | 3.0 yrs | 58.7 |
| EC Near Covington Facility | Greenfield | — | — | 3.1 yrs | 58.1 |
| EC Near Covington Facility | Greenfield | — | — | 3.1 yrs | 57.4 |
| EC Near Covington Facility | Greenfield | — | — | 3.1 yrs | 57.4 |
| EC Near Covington Facility | Greenfield | — | — | 3.1 yrs | 57.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Near Covington Facility, ALLEGHANY. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.