Savernake Tract
Shovel-ReadyBUENA VISTA (CITY), Virginia · PJM
Savernake Tract is a shovel-ready datacenter candidate site in BUENA VISTA (CITY), Virginia, interconnecting through PJM. It screens at 47.8/100 DC Readiness.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in BUENA VISTA (CITY), ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP161412 | Substation-Adjacent | 115 kV | 100 MW | 3.0 yrs | 65.1 |
| BUENA VISTA | Substation-Adjacent | 115 kV | 100 MW | 3.0 yrs | 64.7 |
| BALCONY FALLS | Substation-Adjacent | 115 kV | 100 MW | 3.0 yrs | 64.7 |
| CUSHAW | Substation-Adjacent | 115 kV | 100 MW | 3.0 yrs | 61.4 |
| BONTEX (PAPERBOARD MILLS) | Manufacturing | — | — | — | 49.7 |
| EVERBRITE, LLC (SIGN MANUFACTURING) | Manufacturing | — | — | — | 49.7 |
| ADVANCED DRAINAGE SYSTEMS, INC. (METAL TANK (HEAVY GAUGE) MANUFACTURING) | Manufacturing | — | — | — | 49.7 |
| SHENANDOAH HARDWOOD LUMBER CO. (SAWMILLS) | Manufacturing | — | — | — | 49.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.