Tennyson Property

Shovel-Ready

Greene, Virginia · PJM

DC Readiness
48.5
Fair / 100

Tennyson Property is a shovel-ready datacenter candidate site in Greene, Virginia, interconnecting through PJM. It screens at 48.5/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth864

Connectivity

Nearest IXPEquinix CU1/CU2/CU3/CU4 - Culpeper
IXP distance27.3 mi

Site characteristics

Site typeShovel-Ready
Acreage61 ac

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterEquinix CU2
DC distance27.3 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.73¢/kWh
Industrial electricity6.05¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$8,303

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
38
Fiber connectivity12%
41
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Greene, ranked by DC Readiness.

Sites near Tennyson Property
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121549Substation-Adjacent230 kV300 MW3.0 yrs71.1
ELKTON D.P.Substation-Adjacent115 kV100 MW3.0 yrs68.2
ElktonBrownfield1 MW3.1 yrs59.7
Davis Lamb PropertyShovel-Ready49.3
RT 33 PropertyShovel-Ready48.9
Enterprise Pointe / Oliver PropertyShovel-Ready48.7
27 & 29 Industrial DriveShovel-Ready48.5
Spotswood Business Park L 10Shovel-Ready48.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Tennyson Property, Greene. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.