Greenfield (PHILPOTT - FLOYD)

Greenfield

PATRICK, Virginia · PJM

DC Readiness
50.9
Fair / 100

Greenfield (PHILPOTT - FLOYD) is a greenfield datacenter candidate site in PATRICK, Virginia, interconnecting through PJM. It screens at 50.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationPHILPOTT
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.08¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth864
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPCyrusOne NC-1
IXP distance92.4 mi
Fiber providers4
Fiber coverage15.3%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance41.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerAPPALACHIAN POWER CO
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score60/100
Construction cost index55.9 (avg 100)

Location context

Nearest datacenterLumos Networks
DC distance67.4 mi
Nearest rail6.4 mi
Nearest gas pipeline11.2 mi
Nearest fiber route66.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$3,929

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
44
Fiber connectivity12%
25
Energy cost10%
83
Water risk8%
87
Natural hazard8%
60
Buildability7%
45
Labor market4%
50
DC cluster4%
30
Land / acreage3%
46
Construction cost3%
100
Gas pipeline2%
64
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in PATRICK, ranked by DC Readiness.

Sites near Greenfield (PHILPOTT - FLOYD)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121363Substation-Adjacent138 kV100 MW3.1 yrs62.6
EC FFE Patrick CountyGreenfield3.1 yrs56.3
Greenfield (UNKNOWN121252 - UNKNOWN121363)Greenfield138 kV100 MW3.1 yrs55.1
Greenfield (UNKNOWN121363 - FIELDALE)Greenfield138 kV100 MW3.1 yrs52.4
PARKWAY KNITTING CO., INC. (NOT AVAILABLE)Manufacturing48.4
KREAGER WOODWORKING, INC. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing48.4
GRIFFITH LUMBER CO., INC. (SAWMILLS)Manufacturing48.4
HOPKINS LUMBER CO. (SAWMILLS)Manufacturing48.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (PHILPOTT - FLOYD), PATRICK. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.