Greenfield (ALUM RIDGE - CLAYTOR)

Greenfield

Radford, Virginia · PJM

DC Readiness
53.3
Fair / 100

Greenfield (ALUM RIDGE - CLAYTOR) is a greenfield datacenter candidate site in Radford, Virginia, interconnecting through PJM. It screens at 53.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationALUM RIDGE
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.08¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth864
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance95.8 mi
Fiber providers3
Fiber coverage4.5%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance44.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerAPPALACHIAN POWER CO
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index97.5 (avg 100)

Location context

Nearest datacenterLumos Networks
DC distance79.1 mi
Nearest rail7.8 mi
Nearest gas pipeline9.5 mi
Nearest fiber route55.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
44
Fiber connectivity12%
45
Energy cost10%
83
Water risk8%
88
Natural hazard8%
70
Buildability7%
45
Labor market4%
50
DC cluster4%
30
Land / acreage3%
46
Construction cost3%
69
Gas pipeline2%
69
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Radford, ranked by DC Readiness.

Sites near Greenfield (ALUM RIDGE - CLAYTOR)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117068Substation-Adjacent138 kV100 MW3.1 yrs64.5
UNKNOWN121136Substation-Adjacent138 kV100 MW3.1 yrs64.5
Greenfield (CLOVERDALE 765KV - JACKSONS FE)Greenfield765 kV1,000 MW3.0 yrs62.9
NORTH CLAYTORSubstation-Adjacent138 kV100 MW3.1 yrs62.4
CLAYTORSubstation-Adjacent138 kV100 MW3.1 yrs61.1
UNKNOWN121137Substation-Adjacent138 kV100 MW3.1 yrs60.0
EDGEMONTSubstation-Adjacent138 kV100 MW3.1 yrs57.7
Radford Army Ammunition PlantBrownfield6 MW3.1 yrs55.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (ALUM RIDGE - CLAYTOR), Radford. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.