Stone Brewing Company

Brownfield

Richmond City, Virginia · PJM

DC Readiness
62.2
Good / 100

Stone Brewing Company is a brownfield datacenter candidate site in Richmond City, Virginia, interconnecting through PJM. It screens at 62.2/100 DC Readiness.

Power & interconnection

Substation distance2.3 mi
Utility commercial rate0.05¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth864

Connectivity

Nearest IXPEdgeConneX Richmond (EDCRIC01)
IXP distance7.6 mi
Fiber providers5
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance77.9 mi

Site characteristics

Site typeBrownfield
Acreage15 ac
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water
Former usepower_plant
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score60/100
Construction cost index97.2 (avg 100)

Location context

Nearest datacenterQTS Richmond
DC distance2.3 mi
Nearest rail0.3 mi
Nearest gas pipeline4.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity4.81¢/kWh
Industrial electricity4.19¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
43
Speed to power15%
40
Fiber connectivity12%
87
Energy cost10%
100
Water risk8%
91
Natural hazard8%
60
Buildability7%
5
Labor market4%
50
DC cluster4%
100
Land / acreage3%
59
Construction cost3%
69
Gas pipeline2%
86
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Richmond City, ranked by DC Readiness.

Sites near Stone Brewing Company
SiteTypeVoltageCapacityQueue waitScore
Bellmeade Power StationBrownfield330 MW77.5
SPRUANCE NUGSubstation-Adjacent230 kV300 MW3.1 yrs77.1
TAP146366Substation-Adjacent230 kV300 MW3.1 yrs76.4
LAKESIDESubstation-Adjacent230 kV300 MW3.1 yrs75.7
PLAZASubstation-Adjacent230 kV300 MW3.1 yrs75.3
BASINSubstation-Adjacent230 kV300 MW3.1 yrs74.7
IRON BRIDGESubstation-Adjacent230 kV300 MW3.1 yrs74.4
RIVER ROADSubstation-Adjacent230 kV300 MW3.1 yrs74.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Stone Brewing Company, Richmond City. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.