Datacenter Sites in ROCKBRIDGE, Virginia

ROCKBRIDGE has 40 scored datacenter candidate sites averaging 54.7/100 DC Readiness, with a catalogued aggregate of 6,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

40
Candidate sites
54.7/100
Avg DC Readiness
6,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for ROCKBRIDGE

Yessales_tax_exemption
Datacenter tax incentive
6.79¢/kWh
Commercial electricity
5.30¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,763
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in ROCKBRIDGE

Top datacenter sites in ROCKBRIDGE
SiteTypeVoltageCapacityQueue waitScore
LEXINGTONSubstation-Adjacent500 kV1,000 MW3.0 yrs75.9
Greenfield (LEXINGTON - CLOVERDALE EAST)Greenfield500 kV1,000 MW3.0 yrs70.4
TAP138723Substation-Adjacent115 kV100 MW3.0 yrs68.1
Greenfield (DOOMS - LEXINGTON)Greenfield500 kV1,000 MW3.0 yrs67.9
Greenfield (BATH COUNTY - LEXINGTON)Greenfield500 kV1,000 MW3.0 yrs67.6
UNKNOWN121434Substation-Adjacent115 kV100 MW3.0 yrs66.7
Greenfield (BATH COUNTY - LEXINGTON)Greenfield500 kV1,000 MW3.0 yrs66.2
TAP147650Substation-Adjacent115 kV100 MW3.0 yrs65.8
Greenfield (CLIFTON FORGE - LEXINGTON)Greenfield230 kV300 MW3.0 yrs64.9
Greenfield (CLIFTON FORGE - LEXINGTON)Greenfield230 kV300 MW3.0 yrs63.1
FAIRFIELDSubstation-Adjacent115 kV100 MW3.0 yrs62.7
Greenfield (CLIFTON FORGE - LEXINGTON)Greenfield230 kV300 MW3.0 yrs62.1
Greenfield (TAP146997 - LEXINGTON)Greenfield115 kV100 MW3.0 yrs59.3
Greenfield (CLIFTON FORGE - LEXINGTON)Greenfield230 kV300 MW3.0 yrs59.3
Greenfield (STAUNTON - GOSHEN)Greenfield115 kV100 MW3.0 yrs59.0
FEI LTD. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing50.2
POWERSYSTEMS INTERNATIONAL (MOTOR AND GENERATOR MANUFACTURING)Manufacturing50.2
BARGER & SON, CHARLES W. (READY-MIX CONCRETE MANUFACTURING)Manufacturing50.2
LEES CARPET (CARPET AND RUG MILLS)Manufacturing50.2
BARR MARINE BY E D M, INC. (NOT AVAILABLE)Manufacturing50.2
SHENANDOAH FRAMING, INC. (ALL OTHER MISCELLANEOUS WOOD PRODUCT MANUFACTURING)Manufacturing50.2
CONROCK (READY-MIX CONCRETE MANUFACTURING)Manufacturing50.2
BLUE RIDGE LUMBER CO., LLC (SAWMILLS)Manufacturing49.4
BURKE-PARSONS-BOWLBY CORP. (WOOD PRESERVATION)Manufacturing49.4
SHUMATE, INC., GEORGE C. (SAWMILLS)Manufacturing49.4

ROCKBRIDGE datacenter FAQ

How many datacenter sites are in ROCKBRIDGE?
40 scored datacenter candidate sites, averaging 54.7/100 DC Readiness.
Does ROCKBRIDGE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in ROCKBRIDGE?
FEMA's National Risk Index rates ROCKBRIDGE as "Relatively Moderate" (score 30).
What are industrial electricity rates in ROCKBRIDGE?
Average industrial electricity is 5.30¢/kWh and commercial is 6.79¢/kWh in ROCKBRIDGE.

Dataset updated . Screening estimates derived from public data sources.