KETTLE FALLS GENERATING STATION

Substation-Adjacent

Stevens County, Washington · WECC

DC Readiness
62.6
Good / 100

KETTLE FALLS GENERATING STATION is a substation-adjacent datacenter candidate site in Stevens County, Washington, interconnecting through WECC. It screens at 62.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationKETTLE FALLS GENERATING STATION
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPNeutron - Spokane
IXP distance73.7 mi
Fiber providers6
Fiber coverage10.9%
Nearest cloud providerAzure
Nearest cloud regionwestus2
Cloud region distance125.3 mi

Site characteristics

Parcel ownerAVISTA CORP
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteAVISTA UTILITIES KETTLE FALLS
Hazard sub-score62/100
Construction cost index64.4 (avg 100)

Location context

Nearest datacenterLumen
DC distance74.0 mi
Nearest rail0.3 mi
Nearest gas pipeline8.9 mi
Nearest fiber route176.7 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.91¢/kWh
Industrial electricity7.54¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$2,014

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
33
Fiber connectivity12%
54
Energy cost10%
97
Water risk8%
69
Natural hazard8%
62
Buildability7%
95
Labor market4%
50
DC cluster4%
25
Land / acreage3%
63
Construction cost3%
96
Gas pipeline2%
71
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Stevens County, ranked by DC Readiness.

Sites near KETTLE FALLS GENERATING STATION
SiteTypeVoltageCapacityQueue waitScore
ADDYSubstation-Adjacent230 kV300 MW1.7 yrs65.4
Greenfield (BELL - ADDY)Greenfield230 kV300 MW1.7 yrs61.2
Greenfield (BELL - ADDY)Greenfield230 kV300 MW1.7 yrs60.8
TAP207711Substation-Adjacent115 kV100 MW1.7 yrs60.1
Greenfield (ADDY - BOUNDARY)Greenfield230 kV300 MW1.7 yrs59.1
Greenfield (ADDY - BOUNDARY)Greenfield230 kV300 MW1.7 yrs58.6
TAP207714Substation-Adjacent115 kV100 MW1.7 yrs58.6
COLVILLESubstation-Adjacent115 kV100 MW1.7 yrs57.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for KETTLE FALLS GENERATING STATION, Stevens County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.