McDowell County, West Virginia · PJM

DC Readiness
66.6
Good / 100

SOURWOOD is a substation-adjacent datacenter candidate site in McDowell County, West Virginia, interconnecting through PJM. It screens at 66.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSOURWOOD
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_APS
Wholesale LMP$43.66/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth118
Avg queue wait3.0 yrs
Recent queue wait4.0 yrs
Completion rate23%
Withdrawal rate77%

Connectivity

Nearest IXPEast Kentucky Network Data Center
IXP distance47.8 mi
Fiber providers4
Fiber coverage86.3%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance111.5 mi

Site characteristics

Parcel ownerHorn John & Georgia Est
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index74.5 (avg 100)

Location context

Nearest datacenterEast Kentucky Network Datacenter
DC distance47.8 mi
Nearest rail2.3 mi
Nearest gas pipeline3.6 mi
Nearest fiber route48.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity12.35¢/kWh
Industrial electricity8.76¢/kWh
Cooling degree days800
Heating degree days5,000
Land price / acre$4,027

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
46
Fiber connectivity12%
71
Energy cost10%
81
Water risk8%
88
Natural hazard8%
78
Buildability7%
95
Labor market4%
50
DC cluster4%
45
Land / acreage3%
49
Construction cost3%
88
Gas pipeline2%
89
Tax incentive2%
0
Climate / cooling2%
85

Nearby comparable sites

Other scored datacenter candidate sites in McDowell County, ranked by DC Readiness.

Sites near SOURWOOD
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN108915Substation-Adjacent138 kV100 MW3.0 yrs66.1
TAP155305Substation-Adjacent138 kV100 MW3.0 yrs65.4
Greenfield (JACKSONS FERRY - WYOMING)Greenfield765 kV1,000 MW3.0 yrs65.2
PAD FORKSubstation-Adjacent138 kV100 MW3.0 yrs64.5
WELCHSubstation-Adjacent138 kV100 MW3.0 yrs64.4
TAP155304Substation-Adjacent138 kV100 MW3.0 yrs63.4
JIM BRANCHSubstation-Adjacent138 kV100 MW3.0 yrs63.1
BEARWALLOWSubstation-Adjacent138 kV100 MW3.0 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SOURWOOD, McDowell County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.