Outagamie County, Wisconsin · MISO

DC Readiness
70.7
Excellent / 100

MAES is a substation-adjacent datacenter candidate site in Outagamie County, Wisconsin, interconnecting through MISO. It screens at 70.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMAES
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth41
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPark data centers - Green Bay, WI
IXP distance3.4 mi
Fiber providers10
Fiber coverage67.6%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance168.1 mi

Site characteristics

Parcel ownerPaul M Schreiber
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteBUCHANNAN MOTOMART
Hazard sub-score68/100
Construction cost index109.6 (avg 100)

Location context

Nearest datacenterInvolta DC
DC distance3.5 mi
Nearest rail0.7 mi
Nearest gas pipeline2.3 mi
Nearest fiber route15.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.66¢/kWh
Industrial electricity8.66¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$7,559

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
47
Fiber connectivity12%
80
Energy cost10%
85
Water risk8%
94
Natural hazard8%
68
Buildability7%
95
Labor market4%
50
DC cluster4%
85
Land / acreage3%
43
Construction cost3%
59
Gas pipeline2%
92
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Outagamie County, ranked by DC Readiness.

Sites near MAES
SiteTypeVoltageCapacityQueue waitScore
WERNER WESTSubstation-Adjacent345 kV600 MW1.4 yrs76.5
NORTH APPLETONSubstation-Adjacent345 kV600 MW1.4 yrs74.4
COMBINED LOCKSSubstation-Adjacent138 kV100 MW1.4 yrs71.5
NORTHSIDESubstation-Adjacent138 kV100 MW1.4 yrs71.3
BUTTE DES MORTSSubstation-Adjacent138 kV100 MW1.4 yrs70.8
TAP139565Substation-Adjacent138 kV100 MW1.4 yrs70.5
APPLE HILLSSubstation-Adjacent138 kV100 MW1.4 yrs70.1
Greenfield (NORTH APPLETON - FITZGERALD)Greenfield345 kV600 MW1.4 yrs70.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MAES, Outagamie County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.