Ozaukee, Wisconsin · MISO

DC Readiness
60.8
Good / 100

FREDONIA is a substation-adjacent datacenter candidate site in Ozaukee, Wisconsin, interconnecting through MISO. It screens at 60.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFREDONIA
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth41
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEthoplex Data Center
IXP distance25.7 mi
Fiber providers4
Fiber coverage28.2%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance118.2 mi

Site characteristics

Parcel ownerHenry & George Land Development Co Llc
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteADVANCED CAST STONE CO
Hazard sub-score68/100
Construction cost index86.4 (avg 100)

Location context

Nearest datacenterEthoplex Data Center
DC distance25.7 mi
Nearest rail0.6 mi
Nearest gas pipeline0.4 mi
Nearest fiber route66.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.04¢/kWh
Industrial electricity8.89¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$8,047

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
47
Fiber connectivity12%
17
Energy cost10%
84
Water risk8%
94
Natural hazard8%
68
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
42
Construction cost3%
78
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Ozaukee, ranked by DC Readiness.

Sites near FREDONIA
SiteTypeVoltageCapacityQueue waitScore
SHEBOYGAN FALLS STATIONSubstation-Adjacent345 kV600 MW1.4 yrs73.5
TAP138061Substation-Adjacent345 kV600 MW1.4 yrs72.6
CEDARSAUKSubstation-Adjacent345 kV600 MW1.4 yrs69.7
PORT WASHINGTON SW YDSubstation-Adjacent138 kV100 MW1.4 yrs67.0
Greenfield (CEDARSAUK - EDGEWATER STATION)Greenfield345 kV600 MW1.4 yrs67.0
Greenfield (TAP138061 - SHEBOYGAN FALLS ST)Greenfield345 kV600 MW1.4 yrs66.6
EC Near Port Washington Generating StationGreenfield1.4 yrs64.2
LYNDONSubstation-Adjacent138 kV100 MW1.4 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.