Datacenter Sites in Rock, Wisconsin
Rock has 80 scored datacenter candidate sites averaging 55.7/100 DC Readiness, with a catalogued aggregate of 4,913 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
80
Candidate sites
55.7/100
Avg DC Readiness
4,913 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
Site-selection context for Rock
Yessales_tax_exemption
Datacenter tax incentive
11.93¢/kWh
Commercial electricity
7.76¢/kWh
Industrial electricity
17
Fiber providers
Low
Water stress
$8,459
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
By site type
Top datacenter sites in Rock
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| KITTYHAWK | Substation-Adjacent | 345 kV | 600 MW | 1.4 yrs | 72.9 |
| PADDOCK | Substation-Adjacent | 345 kV | 600 MW | 1.4 yrs | 71.5 |
| TAP144412 | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 68.5 |
| RUSSELL | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 68.5 |
| Rock River | Brownfield | — | 319 MW | — | 68.4 |
| NORTHWEST BELOIT | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 68.4 |
| BLACKHAWK SW YD | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 67.7 |
| MARINE | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 67.6 |
| JANESVILLE GENERAL | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 67.6 |
| SUNRISE | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 67.2 |
| TURTLE | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 67.2 |
| TAP136969 | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 66.9 |
| TAP137906 | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 66.7 |
| BOC GASSES | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 66.2 |
| JANESVILLE GENERAL SW YD | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 66.1 |
| TRIPP RD | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 65.7 |
| UNKNOWN136972 | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 65.7 |
| Greenfield (PADDOCK - KITTYHAWK) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 65.6 |
| REC LAPRAIRIE | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 65.6 |
| Beloit Coal Ash Landfill | Brownfield | — | 2 MW | — | 65.3 |
| Greenfield (CHRISTIANA - KITTYHAWK) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 64.9 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 64.4 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 63.7 |
| WILCOX | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 63.6 |
| EC Near Blackhawk | Greenfield | — | — | 1.4 yrs | 62.9 |
Rock datacenter FAQ
- How many datacenter sites are in Rock?
- 80 scored datacenter candidate sites, averaging 55.7/100 DC Readiness.
- Does Rock offer datacenter tax incentives?
- Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
- What is the natural-hazard risk in Rock?
- FEMA's National Risk Index rates Rock as "Relatively Low" (score 22).
- What are industrial electricity rates in Rock?
- Average industrial electricity is 7.76¢/kWh and commercial is 11.93¢/kWh in Rock.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Rock, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.