St. Croix County, Wisconsin · MISO

DC Readiness
68.9
Good / 100

TAP139645 is a substation-adjacent datacenter candidate site in St. Croix County, Wisconsin, interconnecting through MISO. It screens at 68.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP139645
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPH5 Data Centers Minneapolis
IXP distance41.9 mi
Fiber providers14
Fiber coverage77.7%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance227.5 mi

Site characteristics

Parcel ownerNORTHERN STATES POWER CO
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index96.1 (avg 100)

Location context

Nearest datacenterWest Wisconsin Telcom DC
DC distance25.7 mi
Nearest rail0.9 mi
Nearest gas pipeline6.7 mi
Nearest fiber route9.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.56¢/kWh
Industrial electricity12.69¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$6,451

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
57
Fiber connectivity12%
70
Energy cost10%
86
Water risk8%
90
Natural hazard8%
78
Buildability7%
65
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
70
Gas pipeline2%
79
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in St. Croix County, ranked by DC Readiness.

Sites near TAP139645
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN139596Substation-Adjacent115 kV100 MW1.4 yrs69.9
UNKNOWN132588Substation-Adjacent161 kV100 MW1.4 yrs69.0
UNKNOWN131981Substation-Adjacent161 kV100 MW1.4 yrs67.3
TAP143561Substation-Adjacent115 kV100 MW1.4 yrs66.6
Greenfield (TAP139645 - APPLE RIVER)Greenfield161 kV100 MW1.4 yrs65.3
UNKNOWN132592Substation-Adjacent161 kV100 MW1.4 yrs64.7
Greenfield (UNKNOWN131984 - UNKNOWN132591)Greenfield115 kV100 MW1.4 yrs64.5
Mine SiteFormer Mine43.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139645, St. Croix County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.