Vilas County, Wisconsin · MISO

DC Readiness
64.4
Good / 100

ST GERMAIN is a substation-adjacent datacenter candidate site in Vilas County, Wisconsin, interconnecting through MISO. It screens at 64.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationST GERMAIN
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXP901 Commerce Dr
IXP distance93.7 mi
Fiber providers6
Fiber coverage52.1%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance292.4 mi

Site characteristics

Parcel ownerNORTHERN STATES POWER CO - WISCONSIN
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteMIKES COLLISION REPAIR FORMER
Hazard sub-score68/100
Construction cost index85.6 (avg 100)

Location context

Nearest datacenter901 Commerce Dr
DC distance93.7 mi
Nearest rail15.3 mi
Nearest gas pipeline4.0 mi
Nearest fiber route110.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.88¢/kWh
Industrial electricity7.97¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$6,174

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
57
Fiber connectivity12%
54
Energy cost10%
86
Water risk8%
93
Natural hazard8%
68
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
53
Construction cost3%
79
Gas pipeline2%
87
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Vilas County, ranked by DC Readiness.

Sites near ST GERMAIN
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN171267Substation-Adjacent115 kV100 MW1.4 yrs65.7
RISER139530Substation-Adjacent115 kV100 MW1.4 yrs64.1
ST GERMAINSubstation-Adjacent115 kV100 MW1.4 yrs63.9
TAP138648Substation-Adjacent138 kV100 MW1.4 yrs63.7
Eagle RiverBrownfield4 MW62.9
LAKOTA ROADSubstation-Adjacent138 kV100 MW1.4 yrs61.5
EAGLE RIVERSubstation-Adjacent115 kV100 MW1.4 yrs58.9
EC Near Eagle RiverGreenfield1.4 yrs58.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ST GERMAIN, Vilas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.