Datacenter Sites in Washington, Wisconsin
Washington has 104 scored datacenter candidate sites averaging 51.8/100 DC Readiness, with a catalogued aggregate of 7,301 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
104
Candidate sites
51.8/100
Avg DC Readiness
7,301 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
Site-selection context for Washington
Yessales_tax_exemption
Datacenter tax incentive
13.21¢/kWh
Commercial electricity
9.16¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$9,471
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
By site type
Top datacenter sites in Washington
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CEDARBURG SOUTH | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 70.4 |
| Greenfield (TAP138061 - GRANVILLE) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 70.4 |
| TAP138062 | Substation-Adjacent | 345 kV | 600 MW | 1.4 yrs | 69.1 |
| MEQUON | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 68.7 |
| Greenfield (TAP138061 - GRANVILLE) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 68.6 |
| Greenfield (TAP138061 - SHEBOYGAN FALLS ST) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 67.3 |
| Greenfield (TAP138062 - CYPRESS) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 66.6 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 66.4 |
| Greenfield (ARCADIAN - TAP138062) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 65.8 |
| Greenfield (TAP138062 - CYPRESS) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 65.7 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 65.4 |
| EC Near WPPI Hartford DG | Greenfield | — | — | 1.4 yrs | 65.1 |
| BARTON | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 64.2 |
| AUBURN | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 63.2 |
| ST. LAWRENCE | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 63.2 |
| Greenfield (TAP138062 - CYPRESS) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 63.1 |
| Greenfield (AUBURN - BUTTERNUT) | Greenfield | 138 kV | 100 MW | 1.4 yrs | 62.6 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 62.4 |
| GLACIER | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 62.3 |
| Greenfield (RANGE LINE SW - PORT WASHINGTO) | Greenfield | 138 kV | 100 MW | 1.4 yrs | 62.3 |
| Greenfield (TAP138061 - SHEBOYGAN FALLS ST) | Greenfield | 345 kV | 600 MW | 1.4 yrs | 62.2 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 62.0 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 61.9 |
| GERMANTOWN SW YD | Substation-Adjacent | 138 kV | 100 MW | 1.4 yrs | 61.6 |
| EC Near WPPI Hartford DG | Greenfield | — | — | 1.4 yrs | 61.3 |
Washington datacenter FAQ
- How many datacenter sites are in Washington?
- 104 scored datacenter candidate sites, averaging 51.8/100 DC Readiness.
- Does Washington offer datacenter tax incentives?
- Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
- What is the natural-hazard risk in Washington?
- FEMA's National Risk Index rates Washington as "Relatively Low" (score 22).
- What are industrial electricity rates in Washington?
- Average industrial electricity is 9.16¢/kWh and commercial is 13.21¢/kWh in Washington.
Dataset updated . Screening estimates derived from public data sources.