Substation-Adjacent Datacenter Sites in District of Columbia
District of Columbia has 16 substation-adjacent datacenter candidate sites. Parcels sited next to existing transmission substations. Co-location with a substation is the single strongest speed-to-power signal — interconnection distance is measured in feet, not miles.
16
Substation-Adjacent sites
71.1/100
Avg score (top 25)
District of Columbia
State
Substation-Adjacent
Type
Top substation-adjacent sites in District of Columbia
| Site | Type | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|
| BUZZARD POINT | Substation-Adjacent | District of Columbia | 230 kV | 300 MW | 3.1 yrs | 75.5 |
| TOKOMA | Substation-Adjacent | District of Columbia | 230 kV | 300 MW | 3.1 yrs | 74.7 |
| BENNING (230KV) | Substation-Adjacent | District of Columbia | 230 kV | 300 MW | 3.1 yrs | 74.5 |
| O ST | Substation-Adjacent | District of Columbia | 138 kV | 100 MW | 3.1 yrs | 72.0 |
| ALABAMA AVENUE | Substation-Adjacent | District of Columbia | 230 kV | 300 MW | 3.1 yrs | 71.7 |
| METZEROTT ROAD | Substation-Adjacent | District of Columbia | 230 kV | 300 MW | 3.1 yrs | 71.5 |
| BENNING (69KV) | Substation-Adjacent | District of Columbia | 115 kV | 100 MW | 3.1 yrs | 71.4 |
| BLADENSBURG | Substation-Adjacent | District of Columbia | 115 kV | 100 MW | 3.1 yrs | 71.4 |
| PEPCO HARVARD | Substation-Adjacent | District of Columbia | 115 kV | 100 MW | 3.1 yrs | 71.1 |
| TUXEDO | Substation-Adjacent | District of Columbia | 115 kV | 100 MW | 3.1 yrs | 70.0 |
| VAN NESS | Substation-Adjacent | District of Columbia | 138 kV | 100 MW | 3.1 yrs | 69.9 |
| BETHESDA | Substation-Adjacent | District of Columbia | 138 kV | 100 MW | 3.1 yrs | 69.7 |
| UNKNOWN162145 | Substation-Adjacent | District of Columbia | 115 kV | 100 MW | 3.1 yrs | 69.3 |
| UNKNOWN123341 | Substation-Adjacent | District of Columbia | 115 kV | 100 MW | 3.1 yrs | 69.2 |
| WILDERCROFT | Substation-Adjacent | District of Columbia | 115 kV | 100 MW | 3.1 yrs | 68.4 |
| TENTH ST | Substation-Adjacent | District of Columbia | 138 kV | 100 MW | 3.1 yrs | 67.5 |
- How many substation-adjacent datacenter sites are in District of Columbia?
- GridCensus catalogs 16 substation-adjacent datacenter candidate sites in District of Columbia.
- What is a substation-adjacent datacenter site?
- Parcels sited next to existing transmission substations. Co-location with a substation is the single strongest speed-to-power signal — interconnection distance is measured in feet, not miles.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Substation-Adjacent sites in District of Columbia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.